
Aran / Burren Technical Manual
8 |
P a g e
Novum Overseas. The Novum Building. Clonshaugh Ind Est. Dublin 17. Ireland | [email protected] | +353 1 803 6400
Back to Back Installation____________________________________________________________
If two Aran cases are to be installed back to back, a ventilation panel must be fitted to ensure adequate airflow.
These are simply clipped into place. When an end of aisle case is fitted to an island configuration, an end of aisle
ventilation kit must be fitted
.
Vent System__________________________________________________________________________
Top Vent.
•
Position cabinets back to back 250mm apart.
•
Drop vent panel into factory fitted receiving brackets.
End Panel
•
Secure End wall brackets to back
panel using screws provided.
•
Push panel gently into brackets
.