06/16 Rev. 09
SERVICE MANUAL
Service Mechanics
DPM – PEM – ALX 92x
111
5. Connect the internal cable to connector
CN 701 on the CPU board [247A].
6. Attach respectively close the rear hood.
7. Plug in the remote operator panel. Switch
on the machine.
8. Operate the machine using the remote
operator panel. Print a service status print-
out (
PRINT INFO > Service status
).
The service printout must show the firm-
ware versions of both operator panels
[248A].
CAUTION!
Manipulating both operator panels si-
multaneously can cause malfuncti-
ons.
Always use only one operator panel at
a time to operate the machine (Using
both operator panels alternately is ad-
missible).
CAUTION!
If the connection cable is longer than
2.5 m, EMC-caused disturbances can
occur.
Only use the factory-installed cable.
Don´t extend the cable.
[247] Connector (A) for the remote operator panel on the CPU
board A6621 (CN 701).
[248] The service status printout shows the firmware for both
operator panels (A).
A
A
Summary of Contents for ALX 92x
Page 3: ...Release 3 6 2016 SERVICE MANUAL ALX 92x Print Apply system ...
Page 356: ...12 14 Rev 05 SERVICE MANUAL Service Electronics 64 xx Gen 2 DPM Gen 2 ALX 92x Gen 2 43 ...
Page 508: ...Edition 1 3 2016 INSTALLATION MANUAL AI retrofitting kit for ALX 92x ...
Page 509: ......
Page 511: ...Installation Manual AI retrofitting kit for ALX 92x 03 2016 4 Content ...
Page 520: ...Installation Manual AI retrofitting kit for ALX 92x 03 2016 00 13 Installation ...
Page 521: ......
Page 522: ...Novexx Solutions GmbH Ohmstraße 3 85386 Eching Germany 49 8165 925 0 www novexx com ...