3.1 Installation standards

This 

ALTAIR

boiler must be installed

in compliance with current laws and
standards, which are taken as being
an integral part of this booklet.

3.2 Installation

3.2.1 Packaging

ALTAIR

boilers are supplied packed

in a strong cardboard box on a woo-
den pallet. On removing the card-
board box, make sure that the boiler
is complete.
The packing materials can be recy-
cled. Dispose of them via specific
waste collection sites.

Keep the packing out of the reach
of children, as, by its very nature, it
may constitute a source of danger.

The producer

 accepts no

responsibility for damage to peo-
ple, animals, or property due to
failure to observe the instruction
above.

The pack contains a packet in which
you will find the installation, opera-
tion, and maintenance manual.

3.2.2 Choosing where to install
the boiler

The following must be taken into
account when choosing where to
install the boiler:
• It is advisable to leave at least 50
cm on each side of the boiler to faci-
litate future maintenance.
• Do not install in damp or dusty
rooms.
• The boiler room must not be acces-
sible to outsiders, children, or ani-
mals.

3.2.3 Installing the boiler

Before connecting the boiler to the
piping for the hot water and heating
systems, clean the piping carefully to
eliminate any metal residue left
during working and welding, and any
oil or grease that may be left and that
could damage the boiler or alter its
operation if it reaches the boiler.

NB: Do not use solvents, as these
could damage the components.

The producer

 accepts no respon-

sibility for damage to people, ani-
mals, or property due to failure to
observe the instructions above.
To install the boiler proceed as follows:
• Remove the galvanised plate on
the lower back part of the boiler.
• Unscrew the four screws which
block the brackets fixing the boiler to
the timber pallet (Fig. 5)
•  Remove the boiler from the pallet
without damaging it.
•  Put spacers between the floor and
the boiler’s feet if necessary, to make
the installation stable.
•  Connect the boiler to the system’s
delivery and return pipes.
• 

Remember that the plumbing

system must include all the safety and
control elements required in terms of
current standards (safety valve, water
pressure switch, heat discharge valve,
pressure gauge, etc.).
•  Couple the boiler to the flue.
•  Connect to the electrical system of
the boiler: the ambient thermostat,
the heating pump, and the heating
water pressure switch.
• Connect to the electrical mains.

3.2.4 Ventilation of boiler rooms

ALTAIR

boilers have open combu-

stion chambers and are designed for
being connected to a smoke flue.
The combustion-supporting air is
drawn 

directly from the room in

which the boiler is installed.

It is obligatory that the boiler be
installed in an adequate room in
terms of the current standard, 

which

is taken as an integral part of this
booklet.

3.2.5 Smoke chimney system

The 

ALTAIR

boilers have a smoke

flue coupling that is suitable for con-
necting to a smoke chimney with a
diameter as specified in the techni-
cal data tables.
Current standards must be complied
with when discharging smoke into
the atmosphere, and 

these stan-

dards are taken as being an inte-
gral part of this booklet.

The smoke ducts from the boiler are
to be connected to a smoke flue for-
med as indicated in current stan-
dards, 

which are taken as being an

integral part of this booklet.

The following obligatory require-
ments for smoke flues and smoke
ducts must be kept in mind:
•  They are to be of a diameter not
less than that on the boiler outlet.
•  They are to be made of impermea-
ble material that can withstand the
smoke temperature and related acid
condensate.
•  They are to have low thermal con-
ductivity, sufficient mechanical
strength, be properly sealed, and of a
calculated height and cross-section.
•  The vertical inclination (smoke flue
pipe) and section are to be constant,
without any bottlenecks.
• Where horizontal flues sections
have to be used, these must be at an
incline of at least 5%.
• The end of the flue pipe is to be
such that it can ensure efficient, con-
stant evacuation of smoke under any
weather conditions.
•  The end section of the flue pipe is
to be at least 0,5 m above any adja-
cent structure within a 5 m radius.

3. INSTRUCTIONS FOR THE INSTALLER

11

fig. 5

Summary of Contents for ALTAIR RTN 18

Page 1: ...ALTAIR RTN IST 04 C 126 01 BRAND NAME INSTALLATION USE AND MAINTENANCE GB ...

Page 2: ...1 Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly ...

Page 3: ...als can be recycled and must be taken to specific separated col lection areas Keep the packing out of reach of chil dren as by its very nature it may constitute a source of danger Should the equipment break down and or function defectively switch it off and do not attempt to repair it yourself Call in only qualified per sonnel Any repairs to this product must be made using only original spare part...

Page 4: ...tallation standards page 11 3 2 Installation page 11 3 2 1 Packaging page 11 3 2 2 Choosing where to install the boiler page 11 3 2 3 Installing the boiler page 11 3 2 4 Ventilation of boiler rooms page 11 3 2 5 Smoke chimney system page 11 3 2 6 On site measurement of combustion efficiency page 12 3 2 7 Connecting to the gas mains page 12 3 2 8 Connecting to the electrical mains page 12 3 2 9 Plu...

Page 5: ...y Burner cut out LED red only E models 7 This light indicates that the burner safety device has tripped due to a malfunction Burner operation LED yellow 8 This light indicates that the burner is operating Thermometer or pressure gauge 9 The thermometer s function is to indi cate the temperature of the water in the boiler while the thermometer pressure gauge is used to indicate the pressure as well...

Page 6: ...oilers there may be airlocks in the pipes The boiler s burner may cut out a few times Restart the burner using the reset button see the following paragraphs 1 2 2 Switching off For E models Set the main switch on the OFF position the switch is not lit up If necessary shut the fuel stopcock For models with a thermoelectric valve On these models when the main switch is on the OFF position switch not...

Page 7: ...Maintenance The user is obliged to have routine maintenance done on the boiler and the burner once a year Correct maintenance of the boiler allows it to work under the best con ditions protects the environment and makes the equipment fully safe for people animals or property The boiler must be maintained only by qualified personnel The user may only clean the casing on the boiler and this must be ...

Page 8: ...ed by Directive 92 31 EEC dated 28th April 1992 European Community Low Voltage Directive 73 23 EEC dated 19th February 1973 as amended by Directive 93 68 EEC dated 22nd July 1993 and they are fitted with all the safety devices called for in the current stan dards for this type of product The main technical characteristics of the ALTAIR boiler are listed below High performance cast iron heat exchan...

Page 9: ...RTN E 80 RTN E 90 RTN E 100 2 2 Dimensions NOTE in the PV models equipped with circulation pump and expansion tank R and M connection are G 3 4 8 L Delivery Return Gas Smoke Flue mm M R G D mm 525 G1 1 4 G1 1 4 G 3 4 110 525 G1 1 4 G1 1 4 G 3 4 130 625 G1 1 4 G1 1 4 G 3 4 130 725 G1 1 4 G1 1 4 G 3 4 150 MODEL RTN 18 RTN E 18 RTN 24 RTN E 24 RTN 32 RTN 36 RTN E 32 RTN E 36 RTN 48 RTN E 48 fig 3 fig...

Page 10: ...80 3 2 05 0 5 26 4 2 51BP2712 II2H3 B11BS kW kW Kg l l h mm bar C V Hz W A C Kg h mm mm mbar Stm3 h C Kg h mm mm mbar kg h EC Efficiency class EC PIN Category Type Heat output Heat input Performance at nominal load Performance at reduced load 30 Maintenance losses T 50 Flue losses with burner extinguished Flue losses with burner working N of elements of the heat exchanger Net weight Water content ...

Page 11: ...RTN E 80 RTN E 90 RTN E 100 51BP2708 II2H3 B11BS kW kW Kg l l h mm bar C V Hz W A C Kg h mm mm mbar Stm3 h C Kg h mm mm mbar kg h EC Efficiency class EC PIN Category Type Heat output Heat input Performance at nominal load Performance at reduced load 30 Maintenance losses T 50 Flue losses with burner extinguished Flue losses with burner working N of elements of the heat exchanger Net weight Water c...

Page 12: ...iler to the system s delivery and return pipes Remember that the plumbing system must include all the safety and control elements required in terms of current standards safety valve water pressure switch heat discharge valve pressure gauge etc Couple the boiler to the flue Connect to the electrical system of the boiler the ambient thermostat the heating pump and the heating water pressure switch C...

Page 13: ...rth the system Gas water or heating system pipes are not sui table for earthing the system 3 2 9 Plumbing connections Before installation the boiler should be cleaned in order to remove as far as possible the impurities that may come from the components as far as possi ble as these could damage the circu lation pump or the heat exchanger The heating delivery and return pipes must be connected to t...

Page 14: ... boiler follow the User s Instructions 3 5 Wiring Diagrams BC Flame control EA Ignition electrode ER Flame detection electrode F1 Protection fuse F4A 250V IG Main switch marked on off on the printed circuit L1 Smoke thermostat gas pressure gauge indication L3 Heating circulation unit indication L4 Burner ON indication L5 Safety thermostat indication L6 Burner cut out indication only E models Lon P...

Page 15: ...3 5 1 General layout 14 fig 6 fig 7 ALTAIR 18 48 RTN E ALTAIR 18 48 RTN ...

Page 16: ...fig 8 fig 9 15 ALTAIR 60 RTN E ALTAIR 70 100 RTN E ...

Page 17: ...fig 6a fig 7a 16 ALTAIR 18 48 RTN E ALTAIR 18 48 RTN 3 5 2 Topographical Diagrams ...

Page 18: ...fig 8a fig 9a ALTAIR 70 100 RTN E ALTAIR 60 RTN E 17 ...

Page 19: ... that were dis connected Affix the self adhesive label provi ded that indicates the type of gas and pressure for which the equip ment is set 4 MAINTENANCE In order to ensure that the equipment is efficient and that it functions cor rectly maintenance must be carried out annually based on the program me laid out below It is obligatory for all maintenance and repair operations to be car ried out by ...

Page 20: ... Fax 39 0365 820 200 e mail fondital fondital it www novaflorida it BRAND NAME Cod 0LIBISEN10 Uff Pubblicità Fondital IST 04 C 126 01 Dicembre 2004 12 2004 The producer reserves the right to make minor modifications to the products as required without affecting the basic features ...

Reviews: