
I N STA L L AT I O N MA N U A L · S U R FAC E M O U N T · O B E R F L ÄC H E
www.norwell.dk · [email protected]
COPYRIGHT © 2017 Norwell A/S
19
INSTRUCTION FOR ASSEMBLING
NW502 Ping Pong
See separate page for position, zone
and concrete area requirements.
1
Bolt the 5 table top supports
to the side frames.
2
Place the net right in the center
vertically and horizontally.
It has the same width as the
table tops.
3
Add the Multi Glue on top of
all supports, both upper frames
and on top of the foot of the
net.
4
Two people hold one table top
over the frame and all the way
up to the net. Make sure to
center the top on all sides,
lower down and press the top
against frame and supports.
5
Repeat with the next table top.
Table top
supports
Foot of
the net
The net
Always secure bolts
with Loctite.
Add the supplied
Multi Glue.
1
2
3
3
1
The side frames
Table top
supports
Foot of
the net
The net