background image

11 

3.5  Water cooling system 

  Fill the water pan with clean water to 1cm of the edge of the water tray. 

  Ensure that water is delivered adequately to both sides of the blade, as insufficient water supply 

may result in premature failure of the diamond blade. 

  The water pump must never run without water. Always make sure that there is enough water in 

the pan and refill if necessary.  

  In case of frost, empty the water cooling system from its water. 

3.6  Starting the machine 

Connect the machine to the electrical supply. You can start it by pressing the switch on I. To stop 
the machine, press switch on 0. 0 is also the emergency switch. 

Summary of Contents for TR 250 H Clipper

Page 1: ...TR 250 H OPERATING INSTRUCTIONS...

Page 2: ...2...

Page 3: ...184629084 70184629611 is in conformity with the following Directives European Machinery Directive 2006 42 EC LOW VOLTAGE 2006 95 EC Electromagnetic Compatibility Directive 2004 108 EC and European sta...

Page 4: ...4...

Page 5: ...2 Cutting head 10 3 3 Tool assembly 10 3 4 Electrical connections 10 3 5 Water cooling system 11 3 6 Starting the machine 11 4 Transport and storing 12 4 1 Securing for transport 12 4 2 Long period of...

Page 6: ...damage Any risk shall be borne entirely by the user Observing the operating instructions and compliance with inspection and servicing requirements shall also be considered as included under use in acc...

Page 7: ...The use of other tools can damage the machine Read the blades specifications carefully to choose the correct tool for your application Attention is drawn to the use of BS2092 safety goggles in conform...

Page 8: ...for onsite wet cutting operations of a wide range of tiles and masonry products As with all other NORTON CLIPPER products the operator will immediately appreciate the attention given to detail and qu...

Page 9: ...Rotation speed of the blade 2800 min 1 Flange diameter 90 mm Cutting depth mm 60 mm Cutting length mm 1000 mm Sound pressure level 73 dB A ISO EN 11201 Sound energy level 87 dB A ISO EN 3744 Table di...

Page 10: ...isolate it from the main source of electricity To assemble a new blade follow these steps Loosen on the two nuts holding the outer cover of the blade guard and remove it Loosen the hexagonal nut left...

Page 11: ...n premature failure of the diamond blade The water pump must never run without water Always make sure that there is enough water in the pan and refill if necessary In case of frost empty the water coo...

Page 12: ...utting head on the rail by using the knob 4 2 Long period of inactivity If the machine is not going to be used for a long period please take the following measures Completely clean the machine Empty t...

Page 13: ...l to be cut to maintain it against the material stops Always keep your hands away from the moving blade 5 2 1 Full depth or fixed cutting In full depth or fixed cutting the cutting head is locked in a...

Page 14: ...ng head NOTE the harder the material the more rapid should be the forward and backward strokes Step cutting lessens the area of the blade circumference in contact with the material keeping the blade c...

Page 15: ...nd blade fixing devices Clean Motor cooling fans Clean Water pan Clean Motor housing Clean Reachable nuts and screws Tighten up Maintenance of the machine Always perform the maintenance of the machine...

Page 16: ...cable Defective connection cable Change connection cable Defective switch CAUTION can only be solved by qualified electrician Motor is not running Defective motor Change motor or contact motor manufa...

Page 17: ...always the quickest way Clear instructions will avoid problems and faulty deliveries If not sure please send us the defective part In the case of a warranty claim the part must always be returned for...

Page 18: ...rggasse 37 A 5020 SALZBURG Tel 0043 662 43 00 76 77 Fax 0043 662 43 01 75 e mail office sga net Germany Saint Gobain Abrasives GmbH Birkenweg 45 49 D 50389 WESSELING Tel 02236 8911 0 Fax 02236 8911 30...

Page 19: ...19...

Page 20: ...20 SAINT GOBAIN ABRASIVES 190 Bd J F Kennedy L 4930 BASCHARAGE LUXEMBOURG Tel 352 50401 1 Fax 352 501633 e mail sales nlx saint gobain com www construction norton eu 28 04 2008...

Reviews: