SECTION THREE: Installing and wiring the 2201
Page 18
957 Installation Manual, Revision C1
Installing the
2201
2201 parts list
The 2201 includes the following parts (see Figure 7: ”2201
antenna components,” below):
•
2201 GPS/WAAS pod
•
3 mounting screws (10-32 UNF) and 3 washers for deck
mounting
•
50-foot 2201 cable (both ends have waterproof 7-pin
connectors)
Figure 7: 2201 antenna components
Choosing the best
mounting location
Before you drill or cut
, choose a mounting location that meets
the following criteria. The 2201 should be mounted:
•
where there’s enough mounting clearance to easily
connect the cable.
•
low on the vessel, since side-to-side motion caused by the
vessel’s rolling can degrade speed-over-ground (SOG) and
course-over-ground (COG) readings.
NOTE:
Before permanently installing the 2201, try
temporarily installing it and using the 957 to see if
the 2201’s location works well.
50-foot 957POD-CA cable (with
two finished connectors)
3 mounting screws
and 3 washers
2201 GPS/WAAS pod
Summary of Contents for 957
Page 28: ...SECTION THREE Installing and wiring the 2201 Page 24 957 Installation Manual Revision C1 ...
Page 34: ...SECTION FOUR Installing and wiring the 2701 Page 30 957 Installation Manual Revision C1 ...
Page 42: ...SECTION FIVE Checking out the system Page 38 957 INSTALLATION MANUAL Revision C1 ...
Page 70: ...APPENDIX A 957 system technical specifications Page 66 957 INSTALLATION MANUAL Revision C1 ...