NTX403 Installation Approval Test Procedure
F.
Perform a coupled ILS approach to the aircraft's certified limits. Modulate the
NTX403 transmitter on the above frequencies for at least 20 seconds. Observe
any effect on the autopilot. Repeat for each different system such as ILS #2,
GPS, FMS etc.
Observations:
G.
List the power plant, fuel and other electric instruments in the chart provided and
note any anomalies that occur while transmitting. Assess the results.
STEP SYSTEM PASS
FAIL
NOTES
1
Com
1&2
2
VOR/LOC
1&2
3
Glideslope
1&2
4
Xponder & Encoder
5
ADF 1 & 2
6
VG
7
Compass
8
Directional
Gyro
9
Oil
Pressure
10
Fuel
Pressure
11
Oil
Temp
12
Amps
13
Bus
Voltage
14
Fuel
%
15
Ng
16
TOT
17
Torque
%
Rev. 1.00
Apr 28, 2005
Page 4 of 5
ENG-FORM: 634-0101.DOT
CONFIDENTIAL AND PROPRIETARY TO NORTHERN AIRBORNE TECHNOLOGY LTD.