0. OPERATION
The appliance is put in operation to the nominal power with the suitable
nozzles (you see chart fig.2). The pressure of feeding must correspond to how
much suitable in the targetta gives.
2.0 CONTROL OF PRESSURE......................................................................…
To measure the pressure of feeding is enough to prepare of a manometer
To liquid with subdivision least 0.1 mbars (for instance a manometer to U) and
Progress in the following way:
•
Open the frontal panel in way to enter to the ramp of feeding.
•
Unscrew the screw of closing of the taking of pressure
•
Connect the manometer and to measure the pressure.
•
Remove the manometer, re-screw the screw, and verify that there are not
leaks.
2.0 REGULATION FOR THE OPERATION WITH DIFFERENT GAS.............
Both the packing and on the appliance carry the regulation data for suitable
gases. If regulation is necessary for other type gas, you should:
) Verify that type of gas and pressure corresponds to those regulation you
bring that data label gives.
a) Choose the suitable nozzle for the type of gas and for the pressure
available in place, keeping in mind data included on figure 2 of this manual
(keep in mind that the pressure should never exceed 50 mbar) and replace
nozzle, if necessary.