background image

1.

FRAME ASSEMBLY

Assembly is easiest if you layout all parts as

shown

.

There are ten - 

Rafter Poles

, they

are swedged on both ends, and have 3 pre-

drilled holes. The twelve- 

75.5”

x 1.5”

Cross

Rails

do not have swedged ends. 

You can set aside the ten- 

76

” x 2”

Leg

Poles

, they are swedged on one end and

have pre-drilled holes at the base & the top.

It is very important that you determine which

of the 3 & 4 way connectors are meant for

the sides and which are for the crest. The

side connectors have a sharper bend, plus

the 3 way side connectors have corner sup-

ports.

2. CONNECT PIPES

Start with the center, then assemble each side.  

Place cover over frame so that

the grommetted portion is face

down, this allows the valance to

wrap around and cover the

frame eaves.

3. ATTACHING

LEGS

Insert one middle

legs on one side of the
frame,swedged end up, then the
end legs on that same side.
Repeat for the other side. Now
you can secure the legs to the
side bend connectors with pins. 

4. SECURING LEGS

5. TIGHTENING

COVER 

Cover S-Hooks are designed to hold the front

& back of the cover tightly in place.

1.

Hook one onto each of the INSIDE of the

corner legs.  

2.

Adjust the drawstring evenly on each side

of the canopy by pulling the drawstrings on

each end of the cover at the same time.

3

. Secure rope to ”S” Hook.

4.

Step 6 will feature our new ”TwistTight”

procedure to fit the cover snugly.

Side Bend Connectors

(sharp bend)

Top Bend Connectors

(Sloping bend)

PAGE 2             01-25770    1/16/04

67

75.5”

Reviews: