Chapter 17 Hardware procedures 303
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
4
If the cable is to be a custom-made DS3, attach the BNC connectors to
each end of an appropriate length of coax cable.
5
Plug the cable connector into the receptacle labelled IN at the rear of the
EdgeLink.
6
Route the cable to the FP in the switch.
7
Plug the cable into the faceplate at a female BNC connector labelled Tx.
8
Label the cable at each end point to identify its other end and direction of
signaling.
9
Manage any cable slack so that it is away from the switch.
10 Fasten the cable tie-wraps snugly along the path between the EdgeLink
and the switch.
11 Repeat step 1 to step 10 for the second DS3 cable at the connectors
labelled OUT and Rx.
12 When both DS3 interface cables are connected, the software of the
EdgeLink establishes the links with the switch or Preside Multiservice
Data Manager (or both). Coordinate with the software operator of the
EdgeLink to activate its software. Ensure that the configuring is done and
there is connectivity.
Procedure job aid
Table 16
Interface cables between a Passport 15000 or 20000 and an EdgeLink 100
Type and
quantity
Part number
Length
Type of connector at
EdgeLink
Type of connector at
other end
DS1,
two
A0718801, Telco
Systems’ AWX432G5
1.5 m
(5 ft)
90-degree male 64-pin to
64-pin Amphenol/Cinch
RJ48 termination
or wirewrap
DS1,
two
A0718802, Telco
Systems’ AWX432G15
4.6 m
(15 ft)
90-degree male 64-pin to
64-pin Amphenol/Cinch
RJ48 termination
or wirewrap
DS1,
two
A0718803, Telco
Systems’ AWX432G30
9.1 m
(30 ft)
90-degree male 64-pin to
64-pin Amphenol/Cinch
RJ48 termination
or wirewrap
DS1,
set of two
A0718779, Telco
Systems’ AXX432G5
1.5 m
(5 ft)
90-degree male 64-pin
Amphenol/Cinch to
wirewrap
wirewrap at RJ48
termination
(Sheet 1 of 2)
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......