Reznor, Photon, Installation Manual, EN 2021-04, D301310 Iss 0 Page No 7 of 52
G
Uncrating / preparation
Prior to crating and shipping, this unit was test
operated and inspected at the factory and left in
full operating condition. If the unit has incurred
damage in shipment, document the damage
with the transport company and contact your
supplier.
After unpacking the appliance leave it fastened
to the wooden blocks / pallet until just before
siting to prevent damage to the unit.
Read this booklet and become familiar with the
installation requirements of your unit.
Check if the local distribution conditions of
electricity supply, type of gas and pressure of the
appliance are compatible with the data plate.
The appliance must be installed in accordance
with the current rules in force and any local or
national regulations.
The requirements of the "Local Building
Standards office", the premises "Insurance"
undertaking and the "Fire Office" must also be
observed.
Before commencing installation, ensure all
necessary supplies, tools and manpower are
available.
If the installation includes options such as
downturn nozzles etc., install these options
before the heater is suspended. Follow the
instructions included in the option package.