INSTALLATION CHECKLIST
REFRIGERATION SYSTEM
Was unit given 24 hr warm up period
for crankcase heaters (if applicable)?
YES
NO
Stage-1 Liquid Pressure:
HIGH
SIDE:
Stage-1 Suction Pressure:
LOW
SIDE:
INSTALLER: PLEASE LEAVE THESE
INSTRUCTIONS WITH THE OWNER.
INSTALLATION ADDRESS:
CITY:
STATE:
UNIT MODEL #:
UNIT SERIAL #:
Unit Installed Minimum clearances per
YES
NO
INSTALLER NAME:
CITY
STATE
Has the owner’s information been
reviewed with the customer?
YES
NO
Has the Literature Package been left
with the unit?
YES
NO
FILTER SYSTEM
Filter(s) secured in place?
YES
NO
Filter(s) clean?
YES
NO
ELECTRICAL SYSTEM
Electrical connections tight?
YES
NO
Line voltage polarity correct?
YES
NO
Rated Voltage:
VOLTS:
L1-L2 Volts:
VOLTS:
Has the thermostat been calibrated?
YES
NO
Is the thermostat level?
YES
NO
Is the heat anticipator setting correct?
YES
NO
REPLACEMENT PARTS
Replacement parts are available through your distributor.
Please have the complete model and serial number of
the unit when ordering replacement parts.
ELECTRICAL:
• Ambient Sensor
• Contactors
• Capacitors
• Pressure Switches
• Coil Sensor
• Relays
• Compressors
• Transformers
MOTORS:
• Blower Motor
• Fan Motor
COMPONENTS:
• Blower Assembly
• Fan Grille
• Cabinet Panels
• Filter/Driers
• Expansion Valves
PROPOSITION 65 WARNING:
WARNING: This product contains chemicals known
to the state of California to cause cancer.
WARNING: This product contains chemicals known
to the state of California to cause birth defects or
other reproductive harm.
Specifications & illustrations subject to change without notice or incurring obligations (08/22).
O’Fallon, MO, © Nortek Global HVAC LLC 2022. All Rights Reserved.
10414730
(NEW)