background image

7085980

  (Replaces  7085540)   

INsTAllER: PlEAsE lEAVE THEsE

INsTAllATION INsTRUCTIONs WITH

THE HOMEOWNER

Specifications & illustrations subject to change 
without notice or incurring obligations (07/15).
O’Fallon, MO, © Nortek Global HVAC LLC 2015. 
All Rights Reserved.

Summary of Contents for IQ Drive C5BH-E

Page 1: ...l These instructions are primarily intended to assist qualified individuals experienced in the proper installation of this appliance Qualified installermusthavespecificIQDriveTM system training Some local and national codes require licensed installation service personnel for this typeofequipment Readallinstructionscarefully before starting the installation Installation Instructions Split System In...

Page 2: ...2 ...

Page 3: ...e Horizontal Furnace Horizontal Ready Coils for Horizontal Left Installation Horizontal Ready Coils for Horizontal Right Installation 4 Refrigerant Line Connections 6 5 Completing the Installation 7 Condensate Drain Air Filters Close off Plates and Panels Refrigerant Charging 6 Maintenance and Service 7 ...

Page 4: ...tem operation Read the installation manual supplied with the outdoor unit for refrigerant line connection pro cedure requiredlinesizes andotherinformation pertaining to the system installation 1 Refer to the Installation Instructions of the outdoor unit for connection of the additional components of the IQ drive system 2 Make certain that the air delivery of the furnace air handler is adequate to ...

Page 5: ... Install the coil and level it as needed to ensure proper condensate drainage See Figure 2 4 Connect the refrigerant lines as outlined in the Refrigerant Lines section NOTE Use extra care not to damage sensor and transducer 5 Route all wires from valve sensors and transducer thru the strain relief bushing provided and insert the bushing into the hole in the close off plate Replace the close off pl...

Page 6: ...ock bypass air 7 Slide the coil and the horizontal drain pan assembly back into the unit Reattach the tube close off plate 8 Removethecorrespondingdrainlineknock outfromthecoilaccessdoortoallowaccess to the horizontal drain 9 Replace the door Note All condensate pans have primary and secondary drain connections to meet FHA requirements If the application is located in or above a living space where...

Page 7: ... twice during the year generally at the start of each heating and cooling season Close Off Plates and Panels Install the nec essary air close off plates around the refrigerant lines and drain line where required Reinstall all inner and outer panels of the coil case and furnace that were previously removed to install the indoor coil Refrigerant Charging These cased indoor coils are not factory char...

Page 8: ...INSTALLER PLEASE LEAVE THESE INSTALLATION INSTRUCTIONS WITH THE HOMEOWNER Specifications illustrations subject to change without notice or incurring obligations 07 15 O Fallon MO Nortek Global HVAC LLC 2015 All Rights Reserved ...

Reviews: