3DJH
&RQQHFWLRQ3LSH&RQ¿JXUDWLRQ
1.
6WDQGDUGOHQJWKRIFRQQHFWLRQSLSH
- 5m (16 ft), 7.5m (25 ft), 8m (26 ft).
2.
0LQOHQJWKRIFRQQHFWLRQSLSHLVPIW
3.
0D[LPXPOHQJWKRIFRQQHFWLRQSLSHDQGPD[LPXPKHLJKWGLႇHUHQFH
&RROLQJ
Capacity
Max
OHQJWKRI
connection
pipe
0D[KHLJKW
GLႇHUHQFH
%WXK
(1465W)
15M (50 ft)
5M (16 ft)
%WXK
(2051W)
15M (50 ft)
5M (16 ft)
%WXK
(2637W)
15M (50 ft)
5M (16 ft)
%WXK
(3516W)
20M (65 ft)
10M (33 ft)
%WXK
(5274W)
20M (65 ft)
10M (33 ft)
&RROLQJ
Capacity
Max
OHQJWKRI
connection
pipe
0D[KHLJKW
GLႇHUHQFH
%WXK
(7032W)
25M (65 ft)
10M (33 ft)
%WXK
(8204W)
30M (100 ft)
10M (33 ft)
%WXK
(10548W)
30M (100 ft)
20M (65 ft)
%WXK
(12306W)
30M (100 ft)
20M (65 ft)
%WXK
(14064W)
30M (100 ft)
20M (65 ft)
Test Operation
1. Preparation of test operation
• The client approves the installation.
• Explain operation and other important notes to client.
2. Method of test operation
7XUQRQWKHSRZHUSUHVV212))EXWWRQRQWKHUHPRWHFRQWUROOHUWRVWDUW
operation.
• Press MODE button to select AUTO, COOL, DRY, FAN and HEAT to
check whether the operation is normal or not.
,IWKHDPELHQWWHPSHUDWXUHLVORZHUWKDQ&)WKHKHDWSXPSFDQ¶W
VWDUWFRROLQJ