TS571W Installation Instructions
15
14
TS571W / TS571W Installation Instructions
CONTROL BOX INSTALLATION
●
Identify a suitable mounting location for your control
box at least 3 ft. from the ground and no more than 4 ft.
from the primary operator.
●
Once you’ve identified a suitable mounting location,
loosen the four cover screws and open the control
box cover.
●
Locate mounting locations marked ‘P’ inside the
control box, and use them to mount the control box
with the supplied wood screws.
●
Install the Antenna by screwing it in place on the
SMA connector.
●
Orient the antenna to the sky, and securely tighten.
R
OR
R
3’ Min.
3’
Min.
4’
Max.
Step 1
Step 2
Step 3
Note:
If you intend to install and use the MMS100
Wireless Connectivity System (sold separately) with your
gate operator, consider mounting your control box as
high as possible to improve radio performance.
CONNECTING THE OPERATOR AND BATTERY
BAT+
RESET
BAT–
GRN
WHT
RED
BLU
COM
COM
AUX V+ AUX V-
LOCK V+ LOCK V-
PRIMAR
Y
SECONDAR
Y
LOCK
AUX
SW1
SW2
SECURE SEALING NUT
B
SEALING NUTS
●
Remove the sealing nut from each of
the cable glands on the bottom of the
control box.
●
Slide one sealing nut onto the operator
cable and one onto the battery harness.
●
Insert the operator cable and battery
harness through the cables glands
into the control box.
●
Once inserted, secure the cables in
place by tightening the sealing nuts.
Step 1
Step 2