Training of the Owner‟s operation and maintenance personnel is required in cooperation
with the Commissioning Authority. Provide competent, factory authorized personnel to
provide instruction to operation and maintenance personnel concerning the location,
operation, and troubleshooting of the installed systems. The instruction shall be
scheduled in coordination with the Commissioning Authority after submission and approval
of formal training plans. Refer to System Demonstrations, section 01670, for contractor
training requirements. Refer to section 01810, Commissioning, for further contractor
training requirements.
XXXXX OR XXXXX
(2)
Engage a factory-authorized service representative to train Owner‟s maintenance
personnel to adjust, operate, and maintain humidifiers.
(a)
Train Owner‟s maintenance personnel on procedures and schedules for starting and
stopping, troubleshooting, servicing, and maintaining equipment and schedules.
(b)
Review data in maintenance manuals. Refer to Division 1 Section “Contract
Closeout.”
(c)
Review data in maintenance manuals. Refer to Division 1 Section “Operation and
Maintenance Data.”
(d)
Schedule training with Owner, through Architect, with at least seven days advance
notice.
Summary of Contents for SAM-e
Page 5: ...SAM e Engineering 2 Figure 1 SAM e Figure 2 Cross section of distributor pipe ...
Page 9: ...SAM e Engineering 6 Figure 3 General SAM e Dimensions ...
Page 12: ...9 SAM e Engineering Figure 4 General Mini SAM e Dimensions ...
Page 14: ...11 SAM e Engineering Product Selection ...
Page 16: ...13 SAM e Engineering Figure 5 Header Separator Assembly Figure 6 SAM e Stand ...
Page 34: ...31 SAM e Engineering Installation Drawings ...
Page 35: ...SAM e Engineering 32 Figure 8 SAM e Exploded View ...
Page 36: ...33 SAM e Engineering Figure 9 SAM e Insulated Exploded View ...
Page 37: ...SAM e Engineering 34 Figure 10 Mini SAM e Insulated Exploded View ...
Page 39: ...SAM e Engineering 36 Figure 12 Typical SAM e Installation for Atmospheric Steam Applications ...
Page 40: ...37 SAM e Engineering Figure 13 SAM e Internal Baffle Plate ...
Page 43: ...SAM e Engineering 40 Specification ...
Page 49: ...SAM e Engineering 46 Figure 1 KIT 7 8 Header and Adapter Configuration ...
Page 50: ...47 SAM e Engineering Figure 2 Kit 1 Header and Adapter Configuration ...
Page 51: ...SAM e Engineering 48 Figure 3 KIT 2 Header and Adapter Configuration ...
Page 52: ...49 SAM e Engineering Figure 4 KIT 3 Header and Adapter Configuration ...
Page 53: ...SAM e Engineering 50 Figure 5 KIT 4 Header and Adapter Configuration ...
Page 54: ...51 SAM e Engineering Figure 6 KIT 5 Header and Adapter Configuration ...
Page 55: ...SAM e Engineering 52 Figure 7 KIT 5 Header and Adapter Configuration ...
Page 56: ...53 SAM e Engineering Figure 8 KIT 5 Header and Adapter Configuration ...
Page 57: ...SAM e Engineering 54 Figure 9 KIT 6 Header and Adapter Configuration ...
Page 58: ...55 SAM e Engineering Figure 10 KIT 6 Header and Adapter Configuration ...
Page 59: ...SAM e Engineering 56 Figure 11 KIT 6 Header and Adapter Configuration ...
Page 60: ...57 SAM e Engineering Figure 12 KIT 7 Header and Adapter Configuration ...
Page 61: ...SAM e Engineering 58 Figure 13 KIT 7 Header and Adapter Configuration ...
Page 62: ...59 SAM e Engineering Figure 14 KIT 7 Header and Adapter Configuration ...
Page 63: ...SAM e Engineering 60 Figure 15 KIT 8 Header and Adapter Configuration ...
Page 64: ...61 SAM e Engineering Figure 16 KIT 8 Header and Adapter Configuration ...
Page 65: ...SAM e Engineering 62 Figure 17 KIT 8 Header and Adapter Configuration ...
Page 66: ...63 SAM e Engineering Figure 18 KIT 23 Header and Adapter Configuration ...
Page 67: ...SAM e Engineering 64 Figure 19 KIT 24 Header and Adapter Configuration ...
Page 68: ...65 SAM e Engineering Figure 20 KIT 25 Header and Adapter Configuration ...
Page 69: ...SAM e Engineering 66 Figure 21 KIT 25 Header and Adapter Configuration ...
Page 70: ...67 SAM e Engineering Figure 22 KIT 25 Header and Adapter Configuration ...
Page 71: ...SAM e Engineering 68 Figure 23 KIT 26 Header and Adapter Configuration ...
Page 72: ...69 SAM e Engineering Figure 24 KIT 26 Header and Adapter Configuration ...
Page 73: ...SAM e Engineering 70 Figure 25 KIT 26 Header and Adapter Configuration ...
Page 74: ...71 SAM e Engineering Figure 26 KIT 27 Header and Adapter Configuration ...
Page 75: ...SAM e Engineering 72 Figure 27 KIT 27 Header and Adapter Configuration ...
Page 76: ...73 SAM e Engineering Figure 28 KIT 28 Header and Adapter Configuration ...
Page 77: ...SAM e Engineering 74 Figure 29 KIT 29 Header and Adapter Configuration ...
Page 78: ...75 SAM e Engineering Figure 30 KIT 30 Header and Adapter Configuration ...
Page 79: ...SAM e Engineering 76 Figure 31 KIT 30 Header and Adapter Configuration ...
Page 80: ...77 SAM e Engineering Figure 32 KIT 30 Header and Adapter Configuration ...
Page 81: ...SAM e Engineering 78 Figure 33 0 5 NPT Mini Header and Inlet Configuration ...
Page 82: ...79 SAM e Engineering Figure 34 0 75 NPT Mini Header and Inlet Configuration ...
Page 83: ...SAM e Engineering 80 Figure 35 1 NPT Mini Header and Inlet Configuration ...
Page 84: ...81 SAM e Engineering Figure 36 0 875 Mini Header and Inlet Configuration ...
Page 85: ...SAM e Engineering 82 Figure 37 1 75 Mini Header and Inlet Configuration ...
Page 86: ...83 SAM e Engineering Figure 38 3 Mini Header and Inlet Configuration ...