Note: 1) If a modulating control is
connected to the RH2+ then
jumper J10 must be removed from
the control board.
2) If Air Proving Switch is wired to
terminals 1 and 2 of the low
voltage terminal strip (for R
H
2+
Duct), jumper must be installed
between terminals 1 and 8
(supplied with equipment).
RH2+ Installation Check