10-20
Page 5
2008-02-18
(b)
Seal humidifier dispersion-tube duct penetrations with flange.
(c)
Install with required clearance for service and maintenance.
3. TESTING
(a)
System verification testing is part of the commissioning process. Verification
testing shall be performed by the Contractor and witnessed and documented
by the Commissioning Authority. Refer to section 01810, Commissioning, for
system verification tests and commissioning requirements.
XXXXX OR XXXXX
(b)
Manufacturer’s Field Service: Engage a factory-authorized service
representative to inspect field-assembled components and equipment
installation, including piping and electrical connections. Report results in
writing.
(i)
Leak Test: After installation, charge system and test for leaks. Repair
leaks and retest until no leaks exist.
(ii)
Operational Test: After electrical circuitry has been energized, start
units to confirm proper unit operation. Remove malfunctioning units,
replace with new units, and retest.
(iii) Test and adjust controls and safeties. Replace damaged and
malfunctioning controls and equipment.
3. TRAINING
(a)
Training of the Owner’s operation and maintenance personnel is required in
cooperation with the Commissioning Authority. Provide competent, factory
authorized personnel to provide instruction to operation and maintenance
personnel concerning the location, operation, and troubleshooting of the
installed systems. The instruction shall be scheduled in coordination with the
Commissioning Authority after submission and approval of formal training
plans. Refer to System Demonstrations, section 01670, for contractor
training requirements.
XXXXX OR XXXXX
(b)
Engage a factory-authorized service representative to train Owner’s
maintenance personnel to adjust, operate, and maintain humidifiers.
(i)
Train Owner’s maintenance personnel on procedures and schedules for
starting and stopping, troubleshooting, servicing, and maintaining
equipment and schedules.
(ii)
Review data in maintenance manuals. Refer to Division 1 Section
“Contract Closeout.”
(iii) Review data in maintenance manuals. Refer to Division 1 Section
“Operation and Maintenance Data.”
(iv) Schedule training with Owner, through Architect, with at least seven
days advance notice.
Summary of Contents for NHRS
Page 5: ...2008 02 18 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...10 00 Page 1 2008 02 18 10 00 INTRODUCTION ...
Page 8: ...10 00 Page 3 2008 02 02 Figure 1 NHRS ...
Page 9: ...10 00 Page 4 2008 02 18 THIS PAGE ITENTIONALLY LEFT BLANK ...
Page 10: ...10 10 Page 1 2008 02 18 10 10 HUMIDITY STEAM ABSORPTION DISTRIBUTION ...
Page 15: ...10 10 Page 6 2008 02 18 Figure 2 NHRS Physical Data 010 090 ...
Page 16: ...10 10 Page 7 2008 02 18 Figure 3 NHRS Physical Data 135 180 ...
Page 17: ...10 10 Page 8 2008 02 18 Figure 4 RMBP Physical Data Dimensions ...