21
Contact Support on 020 3011 2040
© Norfolk Greenhouses
Step 22
- Fix SEB1 on top of RLD4A through holes provided, repeat for left side
Step 23
- Fasten top of SJB1 through holes provided, repeat for left side
i
Ensure outside
edge of SEB1
is flush with
outside of YS1
and parallel
with building.
i
Note orientation of
SJB1 so that central
holes align with RL12