background image

8

Canopy

Frame Assembly

Step 2 

- Fix HBD bracket to end of RL17A

Step 1 

- Replace RL20 of existing structure with RL18

Summary of Contents for BCCPSW1800EXT

Page 1: ...ssembly Instructions IMPORTANT Please read these instructions thoroughly before starting assembly Check all parts are present before assembly call 020 3011 2040 for replacement parts These instruction...

Page 2: ...e parts listed before starting the assembly If there are any damaged or missing parts please call us on 020 3011 2040 We will express any missing parts to you as soon as possible Keep these instructio...

Page 3: ...ssembly area Keep the area around your work place area clean and tidy Take care when handling sharp tools and never carry sharp tools in your pocket Never leave your product unattended or partially bu...

Page 4: ...4 Canopy Parts List 1x LEG PST1 2 0m model PST3 2 5m model Framework 1x RL18 1x RL17 1x RL17A 2x RL16 1x BM1 1x GUT1900W 1x XL71...

Page 5: ...5 Contact Support on 020 3011 2040 Norfolk Greenhouses Roof Sheets SR6 1140mm x 1830mm 2x 2x SR7 1140mm x 940mm...

Page 6: ...6 Canopy Parts List Hardware WRUS1 WRKS1 2x 1x HBD 3x HBDT 2x NYLOC 26x STUD30 13x ST4X34 ST8X5 SC6X32 MM7X60 CP6 17x 10x 39x 3x 1x CBM6X80 2x...

Page 7: ...il Step 11 then switch to this manual and continue from Step 2 IF BUILDING EXTENSION AS RETROFIT TO EXISTING STRUCTURE All instructions are written for extension to the right of the existing structure...

Page 8: ...8 Canopy Frame Assembly Step 2 Fix HBD bracket to end of RL17A Step 1 Replace RL20 of existing structure with RL18...

Page 9: ...beams Step 4 Add CP6 to the LEG then fix BM1 between the Leg and RL17A i Offer RL17A to the wall and align horizontally using a spirit level and mark the holes Drill 3 holes using 6mm masonry drill bi...

Page 10: ...10 Canopy Step 6 Fasten 2x HBD brackets to BM1 as shown Step 5 Fix RL17 as front beam between existing structure and LEG Frame Assembly...

Page 11: ...11 Contact Support on 020 3011 2040 Norfolk Greenhouses Step 8 Fix XL71 to underside of BM1 Push fit HBP to exposed end of front beam Step 7 Attach 2x RL16...

Page 12: ...beam see image right Apply fixings 1 to 4 into front beam RL17 every 3rd corrugation see image below Move the structure until framework is square with the wall and sheet Then apply fixings 5 to 7 int...

Page 13: ...of last SR6 sheet to BM1 Step 10 Fix remaining 5x SR6 sheets i Overlay first 4 SR6 sheets by 3 corrugations then overlay last SR6 by 2 corrugations Fix with 8x SC6X32 every 3rd corrugation as shown i...

Page 14: ...SR7 sheets Step 12 Position SR7 on top of first SR6 tight against the wall and fix Roof Assembly i Fix using 9x SC6X32 on exposed edge and every 3rd corrugation as shown i Fix each sheet using 8x SC6...

Page 15: ...15 Contact Support on 020 3011 2040 Norfolk Greenhouses Step 17 Fix exposed edge of last SR7 sheet to BM1 i Fix using 3x SC6X32 as shown...

Page 16: ...16 Canopy Step 18 Assemble gutter and fix to front beam of carport Gutter Assembly...

Page 17: ...Norfolk Greenhouses Step 20 Anchor feet to the ground Step 19 Assemble and fix downpipe to LEG i Use spirit level to align legs in the upright position Fix to the ground through holes in steel foot us...

Page 18: ...xtension to the left of existing structure Use hand saw to cut 66mm from end of front beam and remove This will allow RL17 to pick up on the two end fixings Continue to Step 2 same build method applie...

Page 19: ...19 Contact Support on 020 3011 2040 Norfolk Greenhouses...

Page 20: ...Canopy Norfolk Greenhouses 1 Vincent Avenue Crownhill Industry Milton Keynes MK8 0AB Tel 020 3011 2040 E mail info norfolk greenhouses co uk...

Reviews: