Nordyne C6DA-T Installation Instructions Manual Download Page 4

4

3. COIl INSTAllATION

 WARNING:

Electric furnaces may be connected to 
more than one supply circuit.

Upflow Furnace:

1.  Disconnect  all  electrical  power  to 

 

the furnace. 

2.  Install the coil in the coil cabinet and level 

it  as  needed  to  allow  proper  condensate 

drainage or make a plenum to enclose the 
coil or drop the duct directly over it.

3.  Seal the enclosure as required to minimize 

air leakage.

4.  Connect  the  refrigerant  lines  as  outlined 

in the Refrigerant Lines section.

Downflow FE/E* Electric Furnace:

1.  Ensure  that  all  electrical  power  to  the 

 

furnace is off.

2.  Use  the  appropriate  Coil  Conversion  Kit 

which includes 2 air filters, close-off plates 
(2 sets) and a coil hold down bracket.

3.  Remove the filter located at the top of the 

furnace cabinet.

4.  Remove the refrigerant line knockouts lo

-

cated at the top and bottom of the furnace 
cabinet.

5.  Install  the  coil  and  level  it  as  needed  to 

ensure proper condensate drainage.

6.  Secure  the  coil  hold  down  bracket  with 

screws.

7.  Add air filters to the sides of the coil.
8.  Cut the floor opening for the refrigerant lines 

and drain line (See Figure 6).

9.  Connect the refrigerant lines as outlined in 

the  Refrigerant  Line  Connection  section. 
Connect the drain line and ensure that there 
is a water trap in the water line.

Downflow Furnace with Integral Coil  
Cabinet or Optional Cabinet

1.  Ensure that all electrical power to the furnace 

is off.

2.  On the optional cabinet, refer to its installa-

tion instructions for assembly details.

3.  Remove the knockout in the left bottom cor

-

ner of the furnace and cut an appropriately 

sized hole in the floor. See Figure 6.

Figure 1. Upflow Furnace/Air Handler

Figure 2. Downflow Furnace without Coil 

Cabinet

4.  Remove the interior coil panel. Install the 

coil and level it as needed to ensure proper 
condensate drainage.

5.  Remove the knockout for the refriger

-

ant lines in the secondary covers and  
replace in the furnace.

 

NOTE:

 Modifications to the panel may be 

required.

Summary of Contents for C6DA-T

Page 1: ...licensed installation service personnel for this type of equipment Read all instructions carefully before starting the installation CAUTION Read the installation instructions supplied with the furnac...

Page 2: ...Downflow Electric Furnace Downflow Electric Furnace Air Handler with Integral Coil Cabinet or Optional Coil Cabinet 4 Verify Pressurization 5 5 Refrigerant Line Connections 6 6 Completing the Install...

Page 3: ...nnections are ready to be made NOTE Optionalcooling heatingequipmentmust be properly sized and installed in accordance with the furnace manufacturer s specifications and approved recommendations Heati...

Page 4: ...l it as needed to ensure proper condensate drainage 6 Secure the coil hold down bracket with screws 7 Add air filters to the sides of the coil 8 Cut the floor opening for the refrigerant lines and dra...

Page 5: ...caping Al ways ensure adequate ventilation is present during the depressurization process Any uncertainties should be addressed before proceeding VERIFY PRESSURIZATION TestbydepressingSchradervalveand...

Page 6: ...the assembly nut to separate it from the distributor body 4 Insert a light gauge wire hook between the distributor body and the restrictor orifice to lift the orifice out of the body See Figure 10 Car...

Page 7: ...ng structural damage premature equipment failure or pos sible personal injury Condensate Drain 1 Thread the 3 4 drain fitting included into the lowest tapped hole on the condensate pan Hand tighten th...

Page 8: ...setpriortocharging Refertotheoutdoor unit installation manual for detailed charging instructions 7 MAINTENANCE AND SERVICE To ensure optimum system performance and to minimize the possibility of equip...

Reviews: