background image

Rhino

R

 VE Standard Bulk Unloader

2

Part 1608274

01

E

 2016 Nordson Corporation

d. Repeat the drum change procedure and

adjustment if necessary until the ascent rate

is balanced.

6. Raise the elevator until it reaches its maximum

height, clear of the container (11).

7. Place the ram control valve (2) in the 

Neutral

position.

8. Remove the old container.  Center a new,

undamaged container (11) under the

follower plate (10).

9. Coat the follower plate seals (6) with a

compatible lubricant if required.

10. Remove the blow-off tube (5).
11. Place the ram control valve (2) in the 

Down

position to lower the follower plate (10) into the

container (11).

12. Allow air to bleed from the bleeder

stem fitting (9) as the follower plate (10) moves

downward.  When the material starts to

continuously flow from the bleeder stem fitting,

place the ram control valve (2) in the 

Neutral

position.

13. Install the bleeder stem (8).
14. Place the ram control valve (2) in the 

Down

position to apply downward force to the

elevator.

15. Set the air motor lockout valve (1) to 

On

.

16. Using minimal pump air pressure, bleed the

remaining air through the ball valve and

dispense guns.

NOTE:  

Small-frame pail units 

 The ball valve

or bleed valve is located on the back of the

pump.  Valves are not shown in Figure 1.

17. After all the air is bled, close the ball valve or

the bleed valve.

8

11

9

1

2

3

4

5

7

6

10

NEUTRAL

UP

DOWN

A

A

Figure 1

Rhino VE Standard Bulk Unloader Container Change

Issued 1/16

Original copyright date 2016.  Nordson, the Nordson logo, and Rhino are registered trademarks of Nordson Corporation.

Reviews: