Operator B
Install the new color feed
10
hopper in the feed center.
Connect the fluidizing air
line to the hopper.
Install the level sensor on
the feed hopper.
Remove the lance from
the purge chute and
the purge chute and
install it through the lance
guide and into the
powder.
9
© 2008 Nordson Corporation
All Rights Reserved