
Maintenance
7-13
7.9
Tensioning the Cables
To tension the cables:
1.
Perform a service shutdown as specified in
2.
Remove the X- and Y-axis covers. See
3.
Loosen the X-Axis and two (2) Y-axis tensioner screws.
4.
Move the Z-head in a circle around the dispensing area approximately 5 times.
5.
Stop in the middle.
6.
Retighten the tensioner screws.
Figure 7-9A Tensioning the X-Axis Cables
Figure 7-9B Tensioning the Y-Axis Cables
Item Description
1
X-Axis Tensioner Screw
2
Y-Axis Tensioner Screw
Figure 7-9 Tensioning the Cables
1
2
Summary of Contents for Asymtek Spectrum S-920
Page 2: ......
Page 4: ......
Page 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Page 124: ......
Page 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Page 190: ......
Page 204: ......
Page 208: ......
Page 210: ......
Page 220: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 234: ......