8
4. Identify the Left Upright (89). Have a second
person hold the Left Upright near the Base (94).
See the inset drawing. Tie the lower end of the
wire tie in the Left Upright (89) securely around
the end of the Upright Wire (81). Then, pull the
other end of the wire tie until the Upright Wire is
routed through the Left Upright.
81
4
81
89
Wire
Tie
Wire
Tie
89
94
81
3. Pull the Upright Wire (81) and the base ground
wire (A) through the indicated hole in the
Base (94).
Attach the base ground wire (A) to the Base (94)
with a #8 x 1/2" Ground Screw (10).
Then, press the Grommet (77) into the square
hole in the Base (94).
81
3
94
Hole
10
A
Square
Hole
77