10
3
11
ENGLISH
ENGLISH
Flatten the insulation pipe and cut as indicated in the diagram.
Front loading configuration
Side loading configuration
Position the opening made in the previous
stage facing downwards. This will allow it
to adapt to the bend in the hose.
Fit the insulation pipe around the hose and keep it as close as possible to
the loading kit. Fix it with the bands provided (4).
Band
Band
Upper side
ONLY FOR RECOMMENDED INSTALLATION
ONLY FOR RECOMMENDED INSTALLATION
4
WARNING!
YOU MUST CAREFULLY FOLLOW THE FITTING INSTRUCTIONS PROVIDED!
MAKE SURE THAT YOU HAVE INSULATED THE PIPE COMPLETELY AS INDICATED IN THE FIGURES.
WARNING!
YOU MUST CAREFULLY FOLLOW THE FITTING INSTRUCTIONS PROVIDED!
MAKE SURE THAT YOU HAVE INSULATED THE PIPE COMPLETELY AS INDICATED IN THE FIGURES.
24
Summary of Contents for COMFORT IDRO L80
Page 14: ...A ITALIANO Fare pressione sul lato sinistro dello sportello UTILIZZO DELLO SPORTELLO 14 ...
Page 28: ...A ENGLISH ENGLISH Press on the left side of the door USING THE DOOR 28 ...
Page 32: ...FRANÇAIS COMPOSANTS DU KIT X4 32 ...
Page 42: ...A FRANÇAIS Faire pression sur le côté gauche de la porte UTILISATION DE LA PORTE 42 ...
Page 46: ...DEUTSCH DEUTSCH ZUSAMMENSETZUNG DES SATZES X4 46 ...
Page 56: ...A DEUTSCH DEUTSCH Die Klappe auf der linken Seite eindrücken BENUTZUNG DER TÜR 56 ...
Page 60: ...ESPAÑOL COMPONENTES DEL KIT X4 60 ...
Page 70: ...A ESPAÑOL Presione en el lado izquierdo de la tapa CÓMO USAR LA TAPA 70 ...