Nora Lighting NUTP1 Series Installation Instructions Download Page 2

6505 Gayhart St., Commerce, CA 90040   |   Phone: 800.686.6672   |   www.noralighting.com   |   e-mail: [email protected]    
Instructions subject to change without notice.  © 2018

073118P2

Installation Instructions

SPECIALTY LIGHTING - LED TAPE LIGHT

READ PRIOR TO ATTEMPTING INSTALLATION
ALWAYS TURN OFF MAIN POWER BEFORE INSTALLATION
INSTALLATION SHOULD BE CARRIED OUT BY YOUR LOCAL ELECTRICIAN

Shrink Wrap Installation Instructions to ensure cULus listing:

1. Have one male and one female end of the tape light.
2. Insert male end of the tape light into the pre-cut shrink wrap supplied by Nora Lighting.
3. Connect the male and female connections inside the shrink wrap. Adjust silicone so both tape lights have sufficient shrink wrap covering black insulation.
4. Heat the silicone (hair dryer, or flame at least 6” away from tape/silicone) around entire connection to wrap the connection tightly and maintain cULus listing.

NOTE: 

Use 45W driver for 1 roll of 

NUTP1 tape light or 96W driver for 
2 rolls of NUTP1 tape light.

Item No.

Description

Rating

NUTP1 Series
NUTP4 Series

24V Standard LED Tape Light
12V Standard LED Tape Light

24V / 1.85W/ft

12V / 1.5W/ft

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Reviews: