![Noark Electric ExATSN1/2 Installation Manual Download Page 4](http://html1.mh-extra.com/html/noark-electric/exatsn1-2/exatsn1-2_installation-manual_1697704004.webp)
III. Operating instructions
3.1 Manual test
Before starting installation, the user shall conduct debugging by himself manually, with steps given below:
Verify that the switch is turned to the OFF position; if not, turn it to the OFF position (
Figure 1
);
Insert the handle into the revolving shaft (
Figure 2)
at an angle downward from the equipment
(
Figure 4
);
2))ĺ0DLQWXUQWKHVZLWFKIURPWKH2))WR0DLQSRVLWLRQ
Figures 4 and 5
);
2))ĺ6SDUHSUHVVWKH³VZLWFK´EXWWRQ
Figure 3
) and rotate the handle from the position shown
in
Figure 4
to the position in
Figure 5;
7KHKHDULQJRI³FOLFN´LQGLFDWHVFRPSOHWLRQRIWKHVZLWFKLQJ1RZWKHVZLWFKSRVLWLRQVLJKWJODVV
VKRZV³21´RIWKHPDLQRUVSDUH
Conformance with the above means the self-test is acceptable. In case of any abnormalities, do not
use the equipment and contact the manufacturer.
Figure 1
Figure 3
Figure 2
Figure 4
Figure 5
1RWH
Figure 3 is given for the step of manually switching to spare power.
Summary of Contents for ExATSN1/2
Page 1: ......