background image

Notes and Tips:

1.

All set screws 

(sometimes called "grub" screws) 

and select other screws 

have 

been pre-installed in

 

their

 

specified locations

 

at the factory to aid in identification and assembly

.

 

Remaining hardware

 

needed for assembly 

is

 

included in the hardware pack inside of Box B

.

2.

Some screws may be more difficult than others to turn in due to powder

 

coating

 

residue in the

 

threads.  In these cases a drop of oil or other lubricant

 

(such as

 

WD-40®) can aid in installation, as

 

well as partially tightening and

 

then loosening

 

gradually until the screw is completely fastened.

3.

We 

strongly

 recommend using only the provided Hex (Allen) Wrenches to

 

install/tighten hex-drive

 

screws, and hand tools (ratchet or combination

 

wrench) for other bolts.  Using power tools (even

 

battery powered) can cause

 

threads to strip or hex sockets to round out.

While the diagram has not yet been updated to reflect 

all of 

the latest 

Heavy Duty 

updates to 

your tire 

changer, t

he remainder of the assembly process should 

reasonably 

match the assembly instructions. 

If you have any difficulty assembling your tire changer

 or changing tires

, the instructional videos on our 

website are extremely thorough and helpful, and 

are in the process of being

 updated to show 

many of 

the changes described in these notes. 

If you require further assistance or technical support, please call us at 888-98-NOMAR 
(888-986-6627) and we will be happy to assist you!

Classic

®

 

HD 

Tire Changer

Assembly Preparation

We recommend 

unpacking and 

assembling your tire changer in the following order:

1.

Box 

A

 - Mount/Demount Bar

 (save 5/32" Hex (Allen) Wrench for use with Box

 

B and Box D

)

.  The

 

Mount/Demount Bar has its own set of assembly and usage instructions inside of Box 

A

.

2.

Box 

B

 - Stand Assembly (unless you will be using our Hitch Mount, in which

 

case you may skip Box

 

B

 

however you will still need to remove the 3/16" Hex

 

(Allen) Wrench from Box 

B

 for use

 

assembling

 

Box 

C

.)

a.

Stand Assembly Special Notes

 (

applies to

 changers shipped after February 19, 2019)

:

i.

S

tand posts have been upgraded to a revised Heavy Duty 

design

.  The basic assembly

 

remains the same, except there 

are now 

16

 (sixteen)

 5/16

"

-18x1/2

"

 Flat Socket Head Cap

 

Screws used to secure the stand square and triangle to the stand post flanges.

ii.

There is a tab welded to the stand post with two holes in it.  

This bracket is

 for optionally

 

upgrading to a ground-level ATV bead breaker assembly in the future.  If you are not using

 

the ground-level bead breaker upgrade, 

be sure to

 orient the stand so that the 

tab

 faces

 

rearward and out of the way.

3.

Box 

C

 - Frame Assembly

 (Now 

with

 up to 34" Clearance for Tire Outside Diameter)

4.

Box 

D

 - Upper Arm Assembly

 (Includes revised Heavy Duty Bead Breaker Arm).

a.

The Clevis Collar and Stop Collar for the back post should be left

 over

 from Box 

C

.

Reviews: