background image

12

CONTACT DETAILS:

Email : [email protected]

Web : www.nobutts.com

Tel : 1-888-662-8887

No Butts Bin Company, Inc. 16 Birch Lane, Madison, CT 06443

MAINTENANCE:

To ensure your products give you many years of use we recommend that you:

THANK YOU

FOR PURCHASING THIS PRODUCT

Clean panels regularly with soapy water

Ensure all fittings are tight (for example after a big storm)

Touch up any exposed metal should it get scratched

All Parts and Fixing checked by:

Print Name:

Signature:

Summary of Contents for SR1584

Page 1: ...Assembly Instructions Shelter type SR1584 SR1584 01 240219 USA Email Sales nobutts com Web www nobutts com Tel 1 888 662 8887...

Page 2: ...6 12 11 1 9 10 8 4 3 5 7 13 17 14 16 15 2 2 EXPLODED VIEW Spanner Torx bit Tools required Drill Screwdriver Mallet Hack saw...

Page 3: ...t 220x40 8 66x1 57 5 5 RB1 Bracket 110x42x40 4 33x1 81x1 57 8 6 R3 Rafter 1035x40x40 40 75x1 57x1 57 4 7 L3 Bracket 73x38 2 87x1 50 2 8 P4 Post 1995x40x40 78 54x1 57x1 57 1 9 B3 Beam 1562x40x40 61 50x...

Page 4: ...OF THE SHELTER JF1 CB1 S3 S1 CB1 CB1 Ensure correct alignment on corners 4 Step 1 Assemble S1 and S3 frames to make up the main structure using CB1 brackets in the corners and JF1 brackets on the str...

Page 5: ...RB1 R3 L3 R3 RB1 L3 5 Step 2 Attach R3 rafters using RB1 brackets on the back of the shelter and L3 brackets in the middle...

Page 6: ...L1 A P3 B3 DETAIL A SCALE 1 5 JF1 RB1 DETAIL B SCALE 1 4 L1 6 Step 3 Assemble the B3 s and P4 using the JF1 and RB1 brackets as shown below Attach front beams B3 and centre post P4 to the rafters usi...

Page 7: ...FT1 FT3 FT3 FT1 Step 4 Attach the FT1 and FT3 foot brackets Move the Shelter into its final position and make sure its square Then use concrete anchor bolts to secure it to the the ground 7...

Page 8: ...8 Step 5 Apply the sealing strips SS to the top of the R3 rafters as shown Place ACE3 and the ACC3 roof panels with a small gap on sealing strips use RC3 strips and screws supplied to secure panels i...

Page 9: ...5 20 73 3228 HOLE CENTERS ON FEET 3145 127 09 18 78 41 12 40 75 40 75 526 50 123 82 9 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 200mm or 7 87in oversize...

Page 10: ...NOTES 10...

Page 11: ...NOTES 11...

Page 12: ...06443 MAINTENANCE To ensure your products give you many years of use we recommend that you THANK YOU FOR PURCHASING THIS PRODUCT Clean panels regularly with soapy water Ensure all fittings are tight f...

Reviews: