background image

3

PARTS LIST

Fittings Bolt set M10

Nut Washer Black

Cap

T25

T38

AB1210

M10 x 60mm

25 mm 

Tech 

screw

38 mm 

Tech 

screw

M10/12 x 10mm 

Concrete Bolt

Pack A

30

30

60

60

72

30

8

Required

14

14

28

28

68

30

8

Image

ITEM 

NO.

PART 

NO.

DESCRIPTION DIMENSION 

(MM)

DIMENSION 

(INCHES)

IMAGE

QTY.

1

S1C

Frame

2000x1035 78.74 x 40.55

6

2

P1

Post

1030x2000 40.55 x 78.74

1

3

ST1

Roof Tie

1025x40x40 40.35 x 1.75 x 

1.75

1

4

CB1

Bracket

110x110x40

4.33 x 4.33

7

5

JF1

Bracket

220x40

8.66 x 1.58

6

6

FT1

Foot Bracket 109x100x40 4.29 x 3.93 x 

1.57

3

7

FT3

Foot Bracket 109x100x80 4.29 x 3.93 x 

3.27

5

8

RB1

Bracket

110x46

4.33 x 1.81

8

9

R2

Rafter

2220x40x40 87.40 x 1.57 x 

1.57

3

10

SS

Sealing Strip Trim to 2180 Trim to 2180

2 ROLLS

11

PCE2

Roof Panel

2220x1050 87.40 x 41.34

2

12

RC2

Roof Strip

1130

87.40

3

13

2MD

Roof Edge 

Trim

Trim To Fit

Trim To Fit

3

14

EC40

Plastic end 

Cap

40x40

1.57 x 1.57

18

Summary of Contents for SR1554-F

Page 1: ...Assembly Instructions Shelter type SR1554 F SR1554 F 05 130219 USA...

Page 2: ...EXPLODED VIEW AND TOOLS 11 13 12 2 3 8 9 4 6 6 1 5 10 2 Tools required Drill Screwdriver Mallet Hack saw Spanner Torx bit...

Page 3: ...x 78 74 1 3 ST1 Roof Tie 1025x40x40 40 35 x 1 75 x 1 75 1 4 CB1 Bracket 110x110x40 4 33 x 4 33 7 5 JF1 Bracket 220x40 8 66 x 1 58 6 6 FT1 Foot Bracket 109x100x40 4 29 x 3 93 x 1 57 3 7 FT3 Foot Brack...

Page 4: ...talling CB1 CB1 CB1 CB1 Ensure corners are aligned correctly Step 1 Assemble S1C frames to make up the main structure using CB1 brackets in the corners and JF1 brackets on straight joints Then attach...

Page 5: ...035 FRONT VIEW R2 RB1 FT1 FT3 Step 2 Move shelter in to its final position make sure everything is square and secure to the floor using FT1 and FT3 foot brackets Attach R2 roof rafters using RB1 brack...

Page 6: ...PCE2 SS SS PCE2 Step 3 Apply SS sealing strips to the rafters two for cental rafter and line up the PCE2 roof panels to the outside of the shelter leaving a gap between them 6...

Page 7: ...els and use 38mm Tech screws to secure them in place drilling through the panels and into the rafters Then clip on the 2MD edge trim to the edge of the roof panels tapping them into place with a malle...

Page 8: ...0 1035 1044 50 1136 50 1035 995 2181 2181 40 75 41 12 40 75 39 17 40 75 41 12 85 87 41 12 44 74 Ground anchor positions and overall size Suggested concrete base size 200mm 7 87in oversized on all four...

Page 9: ...NOTES 9...

Page 10: ...NOTES 10...

Page 11: ...NOTES 11...

Page 12: ...anels regularly with soapy water Ensure all fittings are tight for example after a big storm Touch up any exposed metal should it get scratched CONTACT DETAILS Email Sales nobutts com Web www nobutts...

Reviews: