
- 11 -
Overlaid in the order of the release sheet,
cushion rubber.
Close the top heat plate.
Pressurized horizontal to operate the
pressing knob.
During the heating time, which is described in
splicing manual, hold the state in which the
heated and pressurized.
Releasing the pressing knob and remove the
belt.
The belt that was removed from the Heat
press, Use it after cooling for 1 hour or more.
The Heat Press and belt are
hot,
It may cause burns.
The Heat Press after use,
Unplug the power plug
immediately and until cool
to a safe temperature,
please like other people not
to touch carelessly.
WARNING
WARNING
Summary of Contents for PP103
Page 16: ...15 Oct 2020 Rev6 PP103 E...