42
ENGLISH
INSTALLATION
Delivery
See Figure E
The cabinet is supplied as two units, a top part containing
the dehumidying unit and a cabinet lower part.
The top part weighs 82 kg and the lower part weighs
107 kg.
The top part is assembled and lifted into place using four
lifting tubes that are to be inserted at the sides. The lifting
tubes are included in the assembly kit.
Unpacking
Remove all the packaging material. Don’t use sharp
objects as they could damage the product.
After unpacking, check that the product is free from
defects. Any damage, defects or missing parts must
be reported to the distributor immediately.
Check that the product has not been damaged in
transport. Any transport damage must be reported
to the distributor within 7 days.
A complete delivery consists of:
Cabinet with upper part and lower part in two packages
Mounting kit
User manual
Make sure that all the transport protection has been
removed before connecting the cabinet.
Packaging materials such as plastic and Styrofoam
should be kept out of reach of children.
Mounting kit
See Figure H
Assembly of top part
See Figures F and G
1 Lamp glass
2 Blanking plug
3 Cable lead-in
Before the top part is lifted into place
1
Unscrew lamp glass and lamp from the top part to
prevent this being damaged during assembly.
2
Detach the front panel with its insulation. The front
panel is attached by four screws at the top
(A)
and
four screws at the bottom
(B).
See illustration.
Dis-
connect the cable from the control panel before
removing the front panel
3
Fit a 5-core cord to the terminal block on the elec-
tronic panel as shown on wiring diagram. Pull the
cord to the marked grommet in the roof panel.
4
Re-attach the cord to the control panel, and re-
attach the front panel. Press the blanking plugs
supplied home onto the screw heads.
N.B.
The cord must be fitted only by the ma-
nufacturer, the manufacturer’s service agent or other
qualifid electrician.
1 Condensed water hose on a reel
2 Screw T6S 6x75 fzk (2) / Washer (2) / Nylon plug (2)
3 Blanking plug (4)
4 Screw M6S M8x20 (4)
5 Screw (2)
6 Screw M6S 8x16 (2) / Washer BRB 8.4x17x1.6 (4)
7 Angle bracket (2)
8 Lifting tube (4)
9 Brush
Assembly
See Figure J
The assembly kit contains four lifting tubes to be used in
assembly of the top part.
5
Remove the cover plugs
(A)
and insert the lifting
tubes
(B)
at the sides, and twist the tubes so that
they lock firmly.
6
Carefully install the top part on the lower part and
attach using the four M8x20 screws supplied
(1),
as well as the two RTS B8 x 9.5 screws
(2)
for the air
duct as illustrated
7
Pull out the lifting tubes and re-insert the cover
plugs.
8
Re-install lamp and lamp glass.
Keep the lifting tubes in a suitable place after as-
sembly for future use.
Summary of Contents for PRO FT 120 VP
Page 3: ...B A 2 1 3 4 5 1 2 3...
Page 6: ...A B G H 2 3 1 2 3 4 5 6 7 9 8 6...
Page 7: ...A B J K L 1 2 7...
Page 8: ...HELLO M N O P 1 1 8...
Page 23: ......
Page 37: ......
Page 51: ......
Page 52: ...Gematech Innovation...