POSEIDON 7 NEW-C3_en_Ver.1.0_33/12
Adjustment / Test
31
G
Safety valve
Pic. G1: Safety valve
The safety valve’s factory setting for opening pressure = working pr 25 to +30 bars.
Upon each service inspection the setting must be tested and, if necessary, adjusted.
When mounting, affix ball and pressure plate to the spring with lubrication.
The seat is screwed on using a 10mm socket wrench (no gasket required).
Before testing with a pressure gauge, make sure that two threads are visible behind the locknut.
Warning:
Before starting the pump, check that the test manometer valve is open. Close the valve
slowly;
pressure must never exceed 250 bars.
Pic. G2: Tool for Safety valve
6mm Allen wrench
10mm box spanner
no.: 1206754
Summary of Contents for POSEIDON 7 - C3
Page 1: ...POSEIDON 7 C3 SERVICE MANUAL ENGLISH...
Page 32: ...Wiring diagrams POSEIDON 7 NEW C3_en_Ver 1 0_33 12 32 H...
Page 33: ...Wiring diagrams POSEIDON 7 NEW C3_en_Ver 1 0_33 12 33 H...
Page 34: ...Wiring diagrams POSEIDON 7 NEW C3_en_Ver 1 0_33 12 34 H...
Page 35: ...Wiring diagrams POSEIDON 7 NEW C3_en_Ver 1 0_33 12 35 H...
Page 36: ...Wiring diagrams POSEIDON 7 NEW C3_en_Ver 1 0_33 12 36 H...
Page 37: ...Special Tools Spare Parts 37 POSEIDON 7 NEW C3_en_Ver 1 0_33 12 I...
Page 38: ...Notes 38 POSEIDON 7 NEW C3_en_Ver 1 0_33 12...
Page 39: ...Nilfisk ALTO Division of Nilfisk Advance A S Industrivej 1 9650 Hadsund Denmark...