8
Model MV74 Electric
III. OPERATION
MV74E
F. Electrical Connection
Power requirements are stated on the unit rating label. This appliance, when installed must be must be
connected in accordance with the regulations in force. Before starting broiler, tighten all electrical connections
in control box. An electrical wiring diagram can be found inside the control box.
Note: Disconnect power before servicing.
G. Pre-Operation Check
Be sure that all parts are installed in the proper location:
Ventilation is turned on
Broiler is plugged in
Installation
Summary of Contents for MV74 Electric
Page 36: ...36 Model MV74 Electric III OPERATION MV74E Wiring Diagram ...
Page 37: ...37 Model MV74 Electric III OPERATION MV74E Wiring Diagram ...
Page 38: ...38 Model MV74 Electric III OPERATION MV74E This page is left intentionally blank ...
Page 39: ...39 Model MV74 Electric III OPERATION MV74E This page is left intentionally blank ...