background image

26

26

LIMITED TWO-YEAR WARRANTY

Apollo  Gate  Operators  are  warranted  against  defects  for  a  period  of

24  months  from  the  date  of  purchase,  providing  recommended  installation
procedures  are  followed.  This  warranty  is  in  lieu  of  all  other  warranties
expressed  or  implied  (some  states  do  not  allow  limitations  on  how  long  an
implied warranty lasts, so this limitation may not apply to you) and shall be
considered  void  if  damage  was  due  to  improper  installation  or  use,
connection  to  improper  power  source,  or  if  damage  was  caused  by  fire,
flood,  or  lightning.  The  manufacturer  will  not  be  responsible  for  any  labor
charges incurred in the removal or replacement of defective parts.

In case of failure due to defective material or workmanship during the

warranty  period,  the  defective  part  will  be  repaired  or  replaced  at  the
manufacturer’s option at no charge if returned freight prepaid. New or factory
rebuilt replacements may be used. Replacement parts are warranted for the
remaining portion of the original warranty period. The manufacturer will pay
standard  ground  freight  back  to  the  customer  on  the  return  of  repaired  or
replaced items in warranty.

Lighting  or  electrical  power  surges  may  cause  damage  beyond  repair  and
are not covered in this warranty.

APOLLO

Gate Operators, Inc.

Summary of Contents for T5-ETL

Page 1: ...INSTALLATION MANUAL 7 10 T5 ETL T7 ETL 12 VOLT DC Swing Gate Operator...

Page 2: ...d Actuator Installation 8 Limit Adjustments 9 Electrical Connections 11 Battery Connections 12 Encoder Board Connections 13 Dimensions and Options 14 Programming Current Sensing 15 Control Board 16 Si...

Page 3: ...with operator controls Keep the remote con trol away from children Always keep people and objects away from the gate NO ONE SHOULD CROSS THE PATH OF THE MOVING GATE ARM Test the operator monthly see...

Page 4: ...ower outages The battery may be recharged with a trickle charger or by solar energy eliminating the need for costly trenching to remote entrances If a trickle charger is used and a standard electrical...

Page 5: ...d If additional cable is required do not cut out the blocking diode when adding the cable 4 Is electricity available if required Consider safety and access options Recommend if needed 1 Will there be...

Page 6: ...s Toona 5 TO5012 Toona 7 TO7012 i a Actuator b Gate attach bracket two pieces c Pivot bracket d Mounting Hardware e Release lock keys f Control Box g Cable Harness h Caution signs 2 i Battery Charger...

Page 7: ...A B Toona 5 7 1 16 7 1 16 Toona 7 7 3 4 7 3 4 These dimensions are for 4 post with hinge in center Adjust ac cordingly if post size or hinge loca tion varies A B should always be same value Pull to o...

Page 8: ...8 TOONA 5 F 1 75 TOONA 7 F 2...

Page 9: ...9 Toona 5 7 3 9 max Limit Switch Adjustment Loosen nuts and adjust limits Retighten nuts Nuts may be hex or socket...

Page 10: ...10...

Page 11: ...11 T5 ETL Actuator Wiring T7 ETL Limit Wires The limit wires orange and white are reversed on the T7 ETL from the picture shown...

Page 12: ...r battery is recommended with solar charging G CELL 12 Volt 34aH Sealed Battery Connect the two ring terminals on the connec tor end of the cable to the battery The battery charger or solar panel shou...

Page 13: ...13 SIREN GND ACTUATOR CABLE BLUE TOONA Wiring Diagram YELLOW YELLOW RED BLACK...

Page 14: ...14 4 5 4 125 38 5 5 9 47 25 Description 1 Actuator 5 Keypad 2 Photo Beam 6 Siren 3 External Stop 7 Solenoid Lock 4 Photo Beam 8 Control Box Optional 5...

Page 15: ...his procedure 1 Press and hold the LED ENABLE button for five seconds and release The STOP LED will blink indicating that the board is in learn mode 3 Cycle gate arm for 3 4 full cycles The STOP LED w...

Page 16: ...Battery Polarity Indicators Optional Device Input Remote Monitor Outputs Microprocessor Timer To Close Dual Gate Delay Current Sensitivity Adjustments Program Switches 835 836 Control Board Parts Iden...

Page 17: ...ximum travel or the 15 amp fuse will open Fuse should be checked before returning gate to service EMERGENCY BYPASS 12V Supplied battery voltage SLV Slave Operator Indicator indicates slave side of gat...

Page 18: ...to assist in installation and troubleshooting Hold the push button down for five seconds to put the board in program mode RESET Resets the microprocessor Returns processor to last known state Jumpers...

Page 19: ...eased 6 LOCK TYPE For 12V mechanical solenoid locks For 12V magnetic locks 12V for 4 seconds on open cycle 12V when on close limit 7 COAST ENABLE Gate will stop immediately when at Gate will coast min...

Page 20: ...ion see program switch 5 for options OPEN Open input from a 3 button station see program switch 5 for options GND Supplied Battery Ground GND Supplied Battery Ground FREE EXIT Opens gate if closed sto...

Page 21: ...or on the Remote Monitor Output Connector block Connect the black wire to the GND connector on the Remote Monitor Output Connector block Red Black Set Program Switch 4 as preferred ON Upon activation...

Page 22: ...22 PUSH TO OPEN APPLICATION...

Page 23: ...23...

Page 24: ...itches to the same position Transmitters must match code switches for proper operation If power is taken directly from battery or connected as shown below receiver should be configured for 12VDC Multi...

Page 25: ...Sealed Lead Acid Recommended Battery solar charged 12 V 105 aH Battery Charger 1 5 or 6 amp Automatic Recommended Solar Panel 5 watt minimum Duty Cycle Continuous Operating Temperature 400 F 1500 F Cu...

Page 26: ...lightning The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective parts In case of failure due to defective material or workmanship during t...

Reviews: