background image

Installer manual

LEK

VPB 200N

Hot water heater

IHB GB 1046-3

031453

Summary of Contents for VPB 200N

Page 1: ...Installer manual LEK VPB 200N Hot water heater IHB GB 1046 3 031453...

Page 2: ......

Page 3: ...1 Heat pump 11 Cold and hot water 11 Installation alternative 12 5 Electrical installation 13 Sensors 13 Temperature limiter 13 Immersion heater 13 6 Commissioning and adjusting 14 Filling and venting...

Page 4: ...t information about what you should observe when maintain ing your installation TIP This symbol indicates tips on how to facilitate using the product Marking VPB 200N is CE marked and fulfils IP21 The...

Page 5: ...E guarantee is based on the unit being installed and commissioned by a NIBE accredited installer serviced every year and the Benchmark documents completed Where this condition is not met any chargeabl...

Page 6: ...VPB 200N Chapter 1 Important information 4...

Page 7: ...son Date Signature Notes Description Heat pump page 11 Shut off valves Venting valve Shut off valve Hot water page 11 Shut off valves Expansion vessel T P valve Tundish Cold water page 11 Shut off val...

Page 8: ...can bear its weight preferably on a concrete floor or founda tion Use the water heater s adjustable feet to obtain a horizontal and stable set up Pipes must be routed from the safety valve to a suit a...

Page 9: ...ssure reduction valve LEK LEK Connector with cable Armoured hose expansion vessel LEK LEK Expansion vessel with holder Shut off valve Location The kit of supplied items is placed on top of the product...

Page 10: ...LEK XL9 UL UA2 XL8 FD1 UA1 XL5 PF3 XL3 XL4 FL5 QM3 EB1 QQ1 VPB 200N Chapter 3 The water heater design 8 3 The water heater design...

Page 11: ...AC components T P valve FL5 Drain valve hot water G QM3 Inspection cover hole 80 QQ1 Submerged tube for hot water sensor display UA1 Submerged tube for hot water sensor control UA2 Electrical componen...

Page 12: ...bends in the pipework see following picture 500 mm maximum 300 mm minimum Tundish Metal discharge pipe from temperature relief valve to tundish Metal discharge pipe from tundish with continous fall D...

Page 13: ...nnected to VPB 200N Cold and hot water Connecting cold and hot water There must be a mixing valve if the temperature can ex ceed 60 C The flexible hose to the expansion vessel can be installed in the...

Page 14: ...em Installation alternative VPB 200N can be connected in several different ways one of which is shown here Further option information is available at www nibe co uk and in the respective assembly inst...

Page 15: ...UA2 and ensure that the sensor is in the sub merged tube fully and that the cover disc is sealed The bulb for the temperature limiter is in the submerged tube for the display sensor Any sensors must b...

Page 16: ...not included with the product Fill the coil in the hot water heater and the rest of the climate system with water 2 Open the external venting valve 3 When the water that exits the external venting val...

Page 17: ...ure and channel T3 return temperature is adjusted using the circulation pump and control valve Adjustment is made when the flow temperature is approx 45 C and at stable operation 5 minutes after start...

Page 18: ...t any fault before continuing Service actions Safety valves The function of the safety valves must be checked regu larly Perform checks as follows 1 Open the valve by turning the knob anti clockwise c...

Page 19: ...Dimensions and setting out coordinates 1230 43 30 65 260 570 980 17 Chapter 8 Technical data VPB 200N 8 Technical data...

Page 20: ...t water temperature 70 minutes Heating time 15 C to 60 C 8 kW charge power 50 minutes Reheating after draining 140 litres 8 kW charging power 6 0 6 bar MPa Max pressure primary side 6 0 6 bar MPa Max...

Page 21: ...the installation 5 Installation alternative 12 To ground source heat pump 12 Installation area 6 M Maintenance 16 General inspection 16 Hot water heater 16 Marking 2 P Pipe connections 10 Cleaning the...

Page 22: ...pressure relief valve and expansion valve been tted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes Are all...

Page 23: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG Phone 0845 095 1200 Fax 0845 095 1201 info nibe co uk www nibe co uk...

Reviews: