Nibe PV Solar Installer Manual Download Page 8

General

The installation must only be carried out by competent
personnel.

The enclosed materials are those required for the install-
ations described (see page 17). In special cases, they
may need to be supplemented. If unsure, contact the
supplier. Information regarding applicable standards and
regulations must be obtained prior to the installation and
commissioning of the solar panel system. The electrical
installation, and notification to the power supplier, must
be carried out by qualified electricians. The form for the
inverter must be enclosed with the notification (pre-
completed form is available on www.nibe.se) Please
note that the installation must not be put into use until
the power supplier has given its approval.

NOTE

Installation of a solar panel is an extensive in-
tervention on an existing roof. The roof cover-
ing, particularly on converted and inhabited loft
spaces or where the roof's minimum angle is
undersized (relative to the covering), may re-
quire further measures against moisture be-
cause of wind pressure and drifting snow, this
must be evaluated by the installer on a case to
case basis. The roof design must be able to
handle the wind and snow loading that can
occur in the region.

STATIC LOAD

The installation may only be carried out on roof surfaces
or support constructions with sufficient carrying capacity
and strength. The static load capacity of the roof and
roof construction must if necessary be examined before
the solar panels are installed. Great importance should
be placed on the condition of wood roof structures and
the potential of screwing the mounting devices for the
solar panels to the structure. The roof construction must
be reinforced if necessary. Inspection of the whole solar
panel installation in accordance with DIN 1055 part 4
and 5, or in accordance with country specific regulations
is required, in particular, in areas with snow fall and
strong winds. The characteristics of the installation's
location (prevailing wind direction, whirl winds etc.) must

also be included in the calculation/evaluation of whether
these could mean increased loads. The solar panels
must be installed so that snow drifts from snow guards
or caused by special conditions in the installation location
cannot occur in the vicinity of the solar panels.

The distance from the outer edge of the roof must be
at least 1 m at the sides of roofs and 0.2 m at ridges
and roof trusses, this is to reduce the risk of the wind
ripping the solar panels off.

The installation system according to DIN 1055 part 5 for
snow zone II is intended for use up to 400 m above sea
level. If the installation is made on a tiled roof, it is re-
commended that the snow is cleared if it reaches a
depth of more than 30 cm on the solar panels (NOTE!
If the snow has melted, been packed down and then
more snow has fallen and so the density has increased,
the snow may need to be cleared - even though it is not
30 cm deep.)

If there is a risk that the snow will slide down onto the
panels and in particular behind the rear of raised panels,
snow guards must be installed to prevent this.

Ensure that the material under roofs with roof tiles is
sufficiently stable to support the roof mounting points.
Otherwise the roof must be reinforced. The installer
must evaluate this and make a decision, if uncertain a
structural engineer should be consulted. We recommend
that the roof tiles are cut down so that there are no point
loads between the roof and the roof brackets. The min-
imum distance between roof tiles at overlap points and
the underside of the brackets is 3 mm, this is in order
to allow for any movements in the mounting system in
reaction to the loads that occur.

LIGHTNING PROTECTION

If external lightning protection is installed, the solar
panels and the roof structure must be integrated so that
the solar panel field is protected from a direct lightning
strike. The combined solar panel area must be located
within the protective area provided by the lightning
protection. A safety distance of 0.5 m in all directions
from the solar panels to the periphery of the protected
area must be observed.

SAFETY INSTRUCTIONS

• Applicable safety regulations for working on roofs and

similar constructions must be followed.

NIBE PV Solar cell pack-

age

Chapter 3 | Installation

8

3 Installation

Summary of Contents for PV Solar

Page 1: ...IHB EN 1841 2 431707 INSTALLER MANUAL NIBE PV Solar cell package...

Page 2: ......

Page 3: ...e 8 3 Installation 8 General 9 Installation and positioning 10 4 Mounting 10 Installing solar panels in several groups 15 5 Electrical connection 15 Outline diagram 20 6 Maintenance 20 Service 21 7 Te...

Page 4: ...e hazards involved Children shall not play with the appliance Cleaning and user maintenance shall not be made by children without supervision Rights to make any design or technical modifications are r...

Page 5: ...Improper disposal of the product by the user results in administrative penalties in accordance with current le gislation COPYRIGHT The manufacturer retains the copyright for this manual These instruc...

Page 6: ...ed That the solar panels in particular are undamaged Handling Caution Avoid knocks and mechanical damage to the solar panel Do not lift the solar panels by the connections Do not place the solar panel...

Page 7: ...luded 4 4 pcs PV cable with pre installed connectors 7 metres 2 pcs PVI INVERTER 10 XX LEK Inverters 1 pcs EME 20 1 pcs CEILING BRACKET PRM XX 20 20 PCS AVAILABLE FOR FIVE DIFFERENT CEILING TYPES Tile...

Page 8: ...evaluation of whether these could mean increased loads The solar panels must be installed so that snow drifts from snow guards or caused by special conditions in the installation location cannot occur...

Page 9: ...50 900 1000 1000 1000 1050 1050 900 900 950 950 950 800 800 850 90 1200 South Source SMHI Using the diagram and the map one can estimate the annual value of the solar radiation falling on those sur fa...

Page 10: ...to install some panels This means that you have extremely good flexibility al lowing attractive roof installation If you need a larger installation it is perfectly possible to expand it In this case y...

Page 11: ...e sufficient NOTE If there is not a sufficiently stable substructure such as tongued and grooved boards or roof trusses to allow a durable installation the roof must be reinforced Roof bracket stainle...

Page 12: ...spacer plate must be made of a water and weather resistant material not supplied Adapting roof tiles Use an angle grinder or hammer to make a cut out in the part of the roof tile that covers the roof...

Page 13: ...oach bolt with M10 nuts Caution The coach bolt should be installed from under neath before the plate is mounted on the roof Caution Never use the installed roof brackets as a lad der Installing the mo...

Page 14: ...clamp towards the solar panel and connect 5 Position the second solar panel on the mounting rail and move the solar panel towards the assembly clamp Connect the cable to the previous solar panel Secur...

Page 15: ...ry in stalled connection box prepared with wiring for positive and negative connections The cables are fitted with quick release connectors The electrical cables between the panels and the inverter mu...

Page 16: ...he cable is se curely in place by carefully pulling it 6 3 4 Nm 6 Fasten the connector s sleeve so that the cable is se cure and so that the sleeve is at the bottom 3 4 Nm Caution Check that the polar...

Page 17: ...er on the wall bracket according to the dia gram above The inverter must also be earthed as illustrated then cover the switch with silicone to protect against corro sion Switch 10 12mm 40 45mm L1 L2 L...

Page 18: ...rews cable grommets that have not been tightened Set time and date Set Language 2 s 2000 00 00 00 00 2 s 1234567890 Normal 20 s Normal 2018 09 07 Error log Date Time Language Histogram SetTime 11 20 2...

Page 19: ...For information regarding lightning protection see page 8 under Installation FUNCTIONS NIBE Uplink With NIBE Uplink and the Internet you can obtain a quick overview and the current status of the solar...

Page 20: ...lass reverse and aluminium frame are undamaged Check that all electrical wiring and connections are intact and not coated with anything Mechanical cleaning is not usually required and is not recommend...

Page 21: ...our 2 Number of trackers MPPT IP65 Enclosure class 40 32 20 16 16 16 A Rec fuse rating 057 204 057 230 057 203 057 202 057 201 057 200 Part No EME 20 included in inverter PVI 10 81x81x28 m m External...

Page 22: ...1 1 Roof bracket sheet metal roof Part no 057 182 1 pcs PRM 41 1 Roof bracket felt roof Part no 057 183 1 pcs PRM 31 1 Roof bracket seamed sheet metal roof Part no 057 184 1 x PRM 51 1 Ceiling bracket...

Page 23: ...nformation Recovery 5 Safety information 4 L Lightning protection potential compensation 8 M Marking 4 S Safety information 4 Marking 4 Symbols on PV Solar package 4 Safety instructions 8 Static load...

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ...nibe fi NORWAY NETHERLANDS GREAT BRITAIN ABK AS Brobekkveien 80 0582 Oslo Tel 47 23 17 05 20 post abkklima no nibe no NIBE Energietechniek B V Energieweg 31 4906 CG Oosterhout Tel 31 0 168 47 77 22 i...

Page 28: ...y Systems All product illustrations facts and data are based on the available information at the time of the publication s approval NIBE Energy Systems makes reservations for any factual or printing e...

Reviews: