General

The installation must only be carried out by competent
personnel.

The supplied material is the minimum that is required
for use with normal installations, in special cases it may
need to be supplemented. If unsure, contact the sup-
plier. Before the installation and commissioning of the
solar panel system, information on the applicable
norms and regulations must be obtained. Only author-
ised installers may carry out installation of the solar
panels, and give notification to the mains electricity
provider. Note that the installation may not be put into
operation before the mains electricity provider has
given approval.

NOTE

Installation of a solar panel is an extensive in-
tervention on an existing roof. The roof cover-
ing, particularly on converted and inhabited
loft spaces or where the roof's minimum angle
is undersized (relative to the covering), may
require further measures against moisture
because of wind pressure and drifting snow,
this must be evaluated by the installer on a
case to case basis. The roof design must be
able to handle the wind and snow loading that
can occur in the region.

Static load

The installation may only be carried out on roof surfaces
or support constructions with sufficient carrying capa-
city and strength. The static load capacity of the roof
and roof construction must if necessary be examined
before the solar panels are installed. Great importance
should be placed on the condition of wood roof struc-
tures and the potential of screwing the mounting
devices for the solar panels to the structure. The roof
construction must be reinforced if necessary. Inspection
of the whole solar panel installation in accordance with
DIN 1055 part 4 and 5, or in accordance with country
specific regulations is required, in particular, in areas
with snow fall and strong winds. The characteristics of
the installation's location (prevailing wind direction,
whirl winds etc.) must also be included in the calcula-
tion/evaluation of whether these could mean increased
loads. The solar panels must be installed so that snow
drifts from snow guards or caused by special conditions
in the installation location cannot occur in the vicinity
of the solar panels.

The distance from the outer edge of the roof must be
at least 1 m at the sides of roofs and 0.2 m at ridges
and eaves, this is to reduce the risk of the wind ripping
the solar panels off.

The installation system according to DIN 1055 part 5
for snow zone II is intended for use up to 400 m above
sea level. If the installation is made on a tiled roof, it is
recommended that the snow is cleared if it reaches a
depth of more than 30 cm on the solar panels (NOTE!
If the snow has melted, been packed down and then
more snow has fallen and so the density has increased,
the snow may need to be cleared - even though it is
not 30 cm deep.)

If there is a risk that the snow will slide down onto the
panels and in particular behind the rear of raised pan-
els, snow guards must be installed to prevent this.

Ensure that the material under roofs with roof tiles is
sufficiently stable to support the roof mounting points.
Otherwise the roof must be reinforced. The installer
must evaluate this and make a decision, if uncertain a
structural engineer should be consulted. We recom-
mend that the roof tiles are cut down so that there are
no point loads between the roof and the roof brackets.
The minimum distance between roof tiles at overlap
points and the underside of the brackets is 3 mm, this
is in order to allow for any movements in the mounting
system in reaction to the loads that occur.

Lightning protection

If external lightning protection is installed, the solar
panels and the roof structure must be integrated so
that the solar panel field is protected from a direct
lightning strike. The combined solar panel area must
be located within the protective area provided by the
lightning protection. A safety distance of 0.5 m in all
directions from the solar panels to the periphery of the
protected area must be observed.

Safety instructions

Applicable safety regulations for working on roofs
and similar constructions must be followed.

Barriers to protect against falling parts must be in-
stalled. This is particularly important for high build-
ings and locations where a lot of people pass below
the roof/under the building.

Personal safety equipment or scaffolding must be
used when working on roofs, according to the applic-
able.regulations.

Adequate measures must be taken during the install-
ation so that the solar panel does not come loose
and fall.

Observe the safety distance to the current conducting
cables.

PV Solar package

Chapter 3 |

Installation

8

3 Installation

Summary of Contents for PV 3031 3 kW

Page 1: ...Installer manual PV Solar package Accessories IHB GB 1608 2 331737...

Page 2: ......

Page 3: ...6 Contents 7 Supplied components 8 3 Installation 8 General 9 Installation and positioning 10 4 Mounting 16 5 Electrical connection 16 Outline diagram 19 6 Commissioning and program ming 19 Guided fi...

Page 4: ...cilitate using the product Marking The CE marking means that NIBE ensures that the product meets all regulations that are placed on it based on relevant EU directives The CE mark is obligat ory for mo...

Page 5: ...u Pou du Ciel 01600 Reyrieux FR Tel 04 74 00 92 92 Fax 04 74 00 42 00 E mail info nibe fr www nibe fr NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG GB Tel 0845 095 120...

Page 6: ...wall mounting 96 x 64 x 32 x Roof mountings for tiled roofs sheet metal roofs seamed sheet metal roofs or felt roofs 36 x 22 x 12 x Al rails 2 1 metre 48 x 32 x 16 x Mountings for solar panels end cla...

Page 7: ...ackets with T bolts M8x25 mm stainless steel and self locking nuts M8 stainless steel Screw pin M10x250 mm Seam mounting plate 180x60x53 mm LEK Centre clamp Mounting rail L profile Joint profile LEK E...

Page 8: ...of must be at least 1 m at the sides of roofs and 0 2 m at ridges and eaves this is to reduce the risk of the wind ripping the solar panels off The installation system according to DIN 1055 part 5 for...

Page 9: ...r panels are located 100 is the solar radiation falling on a horizontal sur face which in southern Sweden lies between 900 and 1050 kWh year The angle of inclined surfaces is 45 1 Calculate the annual...

Page 10: ...mp System overview installation components 1 2 3 4 5 5 6 19 mm Roof bracket location 1 4 5 5 2 3 6 24 mm Before installing solar panels 1 Number of rows of installed solar panels x height of solar pan...

Page 11: ...s are located in the upper groove NOTE The distance to the edge X must be the same on both sides Installing the roof brackets in tongue and groove Secure each roof bracket with 6 x stainless steel con...

Page 12: ...screwed in to install a seal against the roof sheet A bitumen based roof and building sealant can be used re quired for textured sanded surfaces 3 Install the L profile adjust the height to the other...

Page 13: ...nting rails are secured in the roof brackets with T bolts and locking nuts 8 mm Caution Check that the head of the T bolt is vertical in the mounting rail after tightening The rectangular hole in the...

Page 14: ...he steeper the roof the more important it is to install slide stop screws so that the panels hang against the lowest rail Before installing the lowest solar panels the panels in the bottom row must be...

Page 15: ...clamp Connect the cable to the previous solar panel Secure the wiring between the solar panels 6 Tighten the centre clamp tighten to 12 15 Nm 7 Install further solar panels according to point 4 to 6...

Page 16: ...nnected in series Alternatively 6 kW All panels are connected in series Alternatively 9 kW The panels are connected in two equally long series Installing connectors on DC wiring DC connectors of the M...

Page 17: ...r panels these can be run underneath the roof tiles or ceiling To prevent moisture penetrating under the roof tiles or through the damp barrier at the holes for the electrical cables diffusion sealed...

Page 18: ...re installed connectors 14 m is supplied and can be used for roof installation Grounding solar panels Solar panels should be earthed in the inverter or an external junction box Lightning protection Fo...

Page 19: ...inverter is installed The inverter then downloads the mains network parameters that apply for that country see the Install ation manual and directions for use for the relevant inverter for more inform...

Page 20: ...at 2 Short press The date format is saved 3 Long press 4 Short press The day flashes 5 Press to change day 6 Short press The change is saved 7 Press The month is marked 8 Repeat points 4 to 6 for the...

Page 21: ...6 Short press 7 Press The minutes are marked 8 Repeat points 4 to 6 for the minutes 9 Long press Set country NOTE The country can only be set once 1 Press to mark a country 2 Short press 3 Long press...

Page 22: ...the glass reverse and aluminium frame are undamaged Check that all electrical wiring and connections are in tact and not coated with anything Mechanical cleaning is not usually required and is not rec...

Page 23: ...al dimensions LxWxH Anodised silver Version with aluminium frame 19 kg Weight solar panel 2x1000 mm Connection cables with pre installed con nectors 847x400x225 608x340x222 mm Inverter external dimens...

Page 24: ...on 5 L Lightning protection potential compensation 8 M Marking 4 S Safety information Contact information 5 Marking 4 Symbols 4 Safety instructions 8 Static load 8 Symbols 4 PV Solar package Chapter 9...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...WS name Gemensamt WS version a156 working edition Publish date 2016 03 01 06 43 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 331737...

Reviews: