background image

Contact information

KNV Energietechnik GmbH

, Gahberggasse 11, 4861 Schörfling

AT

Tel: +43 (0)7662 8963-0 Fax: +43 (0)7662 8963-44 E-mail: [email protected] www.knv.at

NIBE Wärmetechnik c/o ait Schweiz AG

, Industriepark, CH-6246 Altishofen

CH

Tel: (52) 647 00 30 Fax: (52) 647 00 31 E-mail: [email protected] www.nibe.ch

Druzstevni zavody Drazice s.r.o

, Drazice 69, CZ - 294 71 Benatky nad Jizerou

CZ

Tel: +420 326 373 801 Fax: +420 326 373 803 E-mail: [email protected] www.nibe.cz

NIBE Systemtechnik GmbH

, Am Reiherpfahl 3, 29223 Celle

DE

Tel: 05141/7546-0 Fax: 05141/7546-99 E-mail: [email protected] www.nibe.de

Vølund Varmeteknik A/S

, Member of the Nibe Group, Brogårdsvej 7, 6920 Videbæk

DK

Tel: 97 17 20 33 Fax: 97 17 29 33 E-mail: [email protected] www.volundvt.dk

NIBE Energy Systems OY

, Juurakkotie 3, 01510 Vantaa

FI

Puh: 09-274 697 0 Fax: 09-274 697 40 E-mail: [email protected] www.nibe.fi

NIBE Energy Systems France Sarl,

Zone industrielle RD 28, Rue du Pou du Ciel, 01600 Reyrieux

FR

Tel : 04 74 00 92 92 Fax : 04 74 00 42 00 E-mail: [email protected] www.nibe.fr

NIBE Energy Systems Ltd

, 3C Broom Business Park, Bridge Way, Chesterfield S41 9QG

GB

Tel: 0845 095 1200 Fax: 0845 095 1201 E-mail: [email protected] www.nibe.co.uk

NIBE Energietechniek B.V.

, Postbus 634, NL 4900 AP Oosterhout

NL

Tel: 0168 477722 Fax: 0168 476998 E-mail: [email protected] www.nibenl.nl

ABK AS

, Brobekkveien 80, 0582 Oslo, Postadresse: Postboks 64 Vollebekk, 0516 Oslo

NO

Tel. sentralbord: +47 23 17 05 20 E-mail: [email protected] www.nibeenergysystems.no

NIBE-BIAWAR Sp. z o. o.

Aleja Jana Pawła II 57, 15-703 BIAŁYSTOK

PL

Tel: 085 662 84 90 Fax: 085 662 84 14 E-mail: [email protected] www.biawar.com.pl

© "EVAN"

17, per. Boynovskiy, Nizhny Novgorod

RU

Tel./fax +7 831 419 57 06 E-mail: [email protected] www.nibe-evan.ru

NIBE AB Sweden

, Box 14, Hannabadsvägen 5, SE-285 21 Markaryd

SE

Tel: +46-(0)433-73 000 Fax: +46-(0)433-73 190 E-mail: [email protected] www.nibe.se

For countries not mention in this list, please contact Nibe Sweden or check www.nibe.eu for more information.

5

Chapter 1 |

Important information

PV Solar package

Summary of Contents for PV 3031 3 kW

Page 1: ...Installer manual PV Solar package Accessories IHB GB 1608 2 331737...

Page 2: ......

Page 3: ...6 Contents 7 Supplied components 8 3 Installation 8 General 9 Installation and positioning 10 4 Mounting 16 5 Electrical connection 16 Outline diagram 19 6 Commissioning and program ming 19 Guided fi...

Page 4: ...cilitate using the product Marking The CE marking means that NIBE ensures that the product meets all regulations that are placed on it based on relevant EU directives The CE mark is obligat ory for mo...

Page 5: ...u Pou du Ciel 01600 Reyrieux FR Tel 04 74 00 92 92 Fax 04 74 00 42 00 E mail info nibe fr www nibe fr NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG GB Tel 0845 095 120...

Page 6: ...wall mounting 96 x 64 x 32 x Roof mountings for tiled roofs sheet metal roofs seamed sheet metal roofs or felt roofs 36 x 22 x 12 x Al rails 2 1 metre 48 x 32 x 16 x Mountings for solar panels end cla...

Page 7: ...ackets with T bolts M8x25 mm stainless steel and self locking nuts M8 stainless steel Screw pin M10x250 mm Seam mounting plate 180x60x53 mm LEK Centre clamp Mounting rail L profile Joint profile LEK E...

Page 8: ...of must be at least 1 m at the sides of roofs and 0 2 m at ridges and eaves this is to reduce the risk of the wind ripping the solar panels off The installation system according to DIN 1055 part 5 for...

Page 9: ...r panels are located 100 is the solar radiation falling on a horizontal sur face which in southern Sweden lies between 900 and 1050 kWh year The angle of inclined surfaces is 45 1 Calculate the annual...

Page 10: ...mp System overview installation components 1 2 3 4 5 5 6 19 mm Roof bracket location 1 4 5 5 2 3 6 24 mm Before installing solar panels 1 Number of rows of installed solar panels x height of solar pan...

Page 11: ...s are located in the upper groove NOTE The distance to the edge X must be the same on both sides Installing the roof brackets in tongue and groove Secure each roof bracket with 6 x stainless steel con...

Page 12: ...screwed in to install a seal against the roof sheet A bitumen based roof and building sealant can be used re quired for textured sanded surfaces 3 Install the L profile adjust the height to the other...

Page 13: ...nting rails are secured in the roof brackets with T bolts and locking nuts 8 mm Caution Check that the head of the T bolt is vertical in the mounting rail after tightening The rectangular hole in the...

Page 14: ...he steeper the roof the more important it is to install slide stop screws so that the panels hang against the lowest rail Before installing the lowest solar panels the panels in the bottom row must be...

Page 15: ...clamp Connect the cable to the previous solar panel Secure the wiring between the solar panels 6 Tighten the centre clamp tighten to 12 15 Nm 7 Install further solar panels according to point 4 to 6...

Page 16: ...nnected in series Alternatively 6 kW All panels are connected in series Alternatively 9 kW The panels are connected in two equally long series Installing connectors on DC wiring DC connectors of the M...

Page 17: ...r panels these can be run underneath the roof tiles or ceiling To prevent moisture penetrating under the roof tiles or through the damp barrier at the holes for the electrical cables diffusion sealed...

Page 18: ...re installed connectors 14 m is supplied and can be used for roof installation Grounding solar panels Solar panels should be earthed in the inverter or an external junction box Lightning protection Fo...

Page 19: ...inverter is installed The inverter then downloads the mains network parameters that apply for that country see the Install ation manual and directions for use for the relevant inverter for more inform...

Page 20: ...at 2 Short press The date format is saved 3 Long press 4 Short press The day flashes 5 Press to change day 6 Short press The change is saved 7 Press The month is marked 8 Repeat points 4 to 6 for the...

Page 21: ...6 Short press 7 Press The minutes are marked 8 Repeat points 4 to 6 for the minutes 9 Long press Set country NOTE The country can only be set once 1 Press to mark a country 2 Short press 3 Long press...

Page 22: ...the glass reverse and aluminium frame are undamaged Check that all electrical wiring and connections are in tact and not coated with anything Mechanical cleaning is not usually required and is not rec...

Page 23: ...al dimensions LxWxH Anodised silver Version with aluminium frame 19 kg Weight solar panel 2x1000 mm Connection cables with pre installed con nectors 847x400x225 608x340x222 mm Inverter external dimens...

Page 24: ...on 5 L Lightning protection potential compensation 8 M Marking 4 S Safety information Contact information 5 Marking 4 Symbols 4 Safety instructions 8 Static load 8 Symbols 4 PV Solar package Chapter 9...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...WS name Gemensamt WS version a156 working edition Publish date 2016 03 01 06 43 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 331737...

Reviews: