Pipe routing
႑
The collected condensation water should be routed to
an appropriate drain.
႑
To achieve as short a length as possible outdoors, we re-
commend routing the water into the house, and then to
a drain. See basic circuit diagram below. It is also possible
to route the water to a gutter or similar for example.
႑
The pipe must be heated by the heating coil all the way
outside to prevent freezing. If the length of the heating
coil is not sufficient, a further heating coil must be used,
which, however, must not be connected inside the heat
pump.
႑
Insulate the pipe (at least 19 mm of insulation) all the
way outside.
႑
Route the pipe downward from the heat pump.
NOTE
The electrical installation and wiring must be carried
out under the supervision of an authorised electrician.