
14
FIGHTER 640P
For the Installer
Pipe connections
Pipe connections
General
Pipe installation must be carried out in accordance with
current norms and directives.
The system requires a low-temperature design of the radia-
tor circuit. At DUT, the highest recommended temperatures
are 55 °C on the flow line and 45 °C on the return line.
When the circulation pump is running, the flow in the
radiator circuit must not be completely stopped. In other
words, in a system where the radiator flow might stop
because all thermostat valves are closed, there must be a
bypass valve to protect the circulation pump.
The total volume is 244 litres, with 189 litres in the water
heater and 55 litres in the boiler section.
The pressure vessel in the FIGHTER 640P is approved for
max 9.0 bar (0.9 MPa) in the water heater and 2.5 bar
(0.25 MPa) in the boiler section.
An overflow pipe should be routed from the safety valve to
an appropriate drain. The dimension of the overflow pipe
must be the same as the waste water pipe and be routed
downwards to prevent water pockets and to be frost proof.
Overflow water from the evaporator collection tray and
safety valves goes via non-pressurised collecting pipes to a
drain so that hot water splashes cannot cause injury.
Pump diagram
The pipe work must be flushed before the
heat pump is connected, so that any con-
taminants do not damage the components
parts.
Note!
Pumpdiagram F640P
0
10
20
30
40
50
60
0
200
400
600
800
1000
1200
1400
Flow l/h
A
vailable pr
essur
e kPa
Hot and cold water are connected to pos (74) (hot water)
and (73) (cold water).
The attendant expansion vessel (107) must be connected
to the hot water system.
The heat pump should be supplemented with an electric
water heater if a bubble pool or other significant consumer
of hot water is installed.
If the heater is equipped with a valve connection Ø of
15 mm, this should be replaced with an equivalent (split) Ø
22 mm coupling.
Appropriate heaters are COMPACT 100-300 for floor-
mounting and EMINENT 35-100 for wall-mounting.
1. Split the valve coupling.
2. Attach the valve coupling section to the heater’s incom-
ing cold water.
3. Attach the mixing valve section to the heater’s outgoing
hot water.
4. Plug the split on the valve coupling section.
LK 550/506/513
LK 545/506/513
LK 545/508/518
MMA
MMA/LK 518
SYR
LK 506
LK 501
SOLE
LK 545/508/514
LK 545/508/514
utan vakuumventil
LK 550/Cu-rör/506//513
LK 540/512
LEK
LEK
LEK
LEK
LEK
LEK
0,9
MP
a
LEK
LEK
LEK
LEK
LK 560/514
ARMA
TUR
LEK
LEK
LEK
ARMATU
R
LEK
ARMATU
R
Ventilkoppel-del
Blandningsventil-del
Valve coupling section
Mixing valve section
KV
VV
VV
INK KV-ANSL
PROPPNING
KV
VV-BEREDARE
MED "DELAT"
VENTILKOPPEL
BACKVENTIL
Kv
Vv från värmepump
Vv
Proppas
Backventil
KV
VV
VV
INK KV-ANSL
PROPPNING
KV
VV-BEREDARE
MED "DELAT"
VENTILKOPPEL
BACKVENTIL
Ventilkoppel-del
Blandningsventil-del
Kv
Vv från värmepump
Vv
Backventil
Blandningsventil
ENDAST FÖR
DANMARK
Valve coupling section
Plugged
Non-return valve
Hw from heat pump
Cw
Hw
Mixing valve section
Tap water connection
Summary of Contents for FIGHTER 640P
Page 2: ......
Page 29: ...27 FIGHTER 640P For the Installer Electrical circuit diagram Electrical circuit diagram...
Page 30: ...28 FIGHTER 640P For the Installer Electrical circuit diagram...
Page 31: ...29 FIGHTER 640P For the Installer Electrical circuit diagram...
Page 32: ...30 FIGHTER 640P For the Installer Electrical circuit diagram...
Page 39: ......