Preparations
■
Before commissioning, check that the charge circuit
and climate system are filled and well vented.
■
Check the pipe system for leaks.
Filling and venting the heating
medium system
1. The heating medium system is filled with water to
the required pressure.
2. Vent the system using the venting nipple (QM20)
on the enclosed flexible hose and possibly the circu-
lation pump.
QM20
Compressor heater
F2040 (does not apply to F2040-6) is equipped with a
compressor heater that heats the compressor before
start-up and when the compressor is cold.
NOTE
The compressor heater must have been connec-
ted for 6 – 8 hours before the first start, see the
section “Start-up and inspection” in the In-
staller Manual for the indoor section
39
Chapter 6 |
Commissioning and adjusting
F2040
6 Commissioning and adjusting
Summary of Contents for F2040-12
Page 1: ...Installer manual LEK LEK LEK UN F2040 6 8 12 16 Air water heat pump IHB EN 1746 6 231844 ...
Page 2: ......
Page 47: ...Connection to board AA23 BP4 BT15 BT12 BT3 AA23 S3 47 Chapter 8 Disturbances in comfort F2040 ...
Page 74: ...F2040 Chapter 11 Technical data 74 ...
Page 77: ...F2040 12 77 Chapter 11 Technical data F2040 ...