
The DIP switch (AA5-S2) must be set as follows.
ON
1
2
3
4
5
6
7
8
ERS 20 no. 2
ON
1
2
3
4
5
6
7
8
ERS 20 no. 1
ON
1
2
3
4
5
6
7
8
ERS 20 no. 4
ON
1
2
3
4
5
6
7
8
ERS 20 no. 3
Outside air sensor
When installing with an electrical preheater (EAH), dis-
connect the outdoor air sensor (BT23) in ERS 20.
The enclosed outdoor air sensor EAH is placed in the
outdoor air duct and connected to the accessory board
(AA5) according to the Installer Manual for EAH.
15
Chapter 5 | Electrical connection
NIBE ERS 20-250
Summary of Contents for ERS 20-250
Page 1: ...IHB EN 2001 1 531798 INSTALLER MANUAL Ventilation heat exchanger NIBE ERS 20 250 LEK...
Page 2: ......
Page 24: ......
Page 25: ......
Page 26: ......