Nibe EMK 300 Installer Manual Download Page 6

General

This accessory is used to measure the amount of energy
produced by and supplied by the heating installation
for hot water and heating in the building.

The function of the energy meter is to measure flow
and temperature difference in the charge circuit. The
value is shown on VVM 320's display.

Contents

Flow meter

1 x

Cable to flow meter

1 x

Connection kit (Lock spring and O-ring)

2 x

O-ring

6 x

Locking clips

1 x

Brass pipe connection nipple

2 x

Copper pipe (ø22)

2 x

Outline diagram

Explanation

Expansion vessel closed, heating medium

CM1

Flow sensor, EMK 300

BF1

Indoor module VVM 320

EB15

Heat pump

EB101

Safety valve, heating medium

FL2

Connection, heating medium, flow

XL1

Connection, heating medium, return

XL2

Connection, docking in heating medium from
heat pump

XL8

Connection, docking, out heating medium to
heat pump

XL9

Designations according to standard IEC 61346-2.

Outline diagram EMK 300 with VVM 320

Note! This is an outline diagram. Actual installations
must be planned according to applicable standards.

-EB15

-EB101

-FL10

-XL8

-XL9

-QM41

-QM40

-XL1

-XL2

-BF1

Pipe connections

Install as follows:

The flow meter is installed on the supply line from the
heat pump, between XL1 and XL8 with the arrow
pointing down in the direction of flow.

The temperature is measured using the installation's
existing sensor.

6

English, Installer manual - EMK 300

GB

Summary of Contents for EMK 300

Page 1: ...EMK 300 Energim tarkit EMK 300 SE Energy meter kit EMK 300 GB Energimesssatz EMK 300 DE Energim lers t EMK 300 DK Energiamittarisarja EMK 300 FI IHB 1423 1 231817...

Page 2: ......

Page 3: ...300 BF1 Innemodul VVM 320 EB15 V rmepump EB101 S kerhetsventil v rmeb rare FL2 Anslutning v rmeb rare fram XL1 Anslutning v rmeb rare retur XL2 Anslutning dockning in v rmeb rare fr n v r mepump XL8...

Page 4: ...rt VVM320 1 2 1 Tryck ner sn ppet 2 Vinkla ut locket och plocka bort det Kabell sning Anv nd l mpligt verktyg f r att lossa l sa fast kablarna i inomhusmodulens plintar LEK 1 1 2 2 3 3 1 2 3 3 4 1 2 L...

Page 5: ...av EMK 300 Aktivering av EMK 300 sker f rsta g ngen ett fl de uppm ts dvs sidan f r energim tning i serviceinfo visas inte f rr n fl de uppm ts f rsta g ngen T NK P Se ven Installat rshandboken f r VV...

Page 6: ...or module VVM 320 EB15 Heat pump EB101 Safety valve heating medium FL2 Connection heating medium flow XL1 Connection heating medium return XL2 Connection docking in heating medium from heat pump XL8 C...

Page 7: ...ng the cover input circuit board VVM320 1 2 1 Push the catch down 2 Angle out the cover and remove it Cable lock Use a suitable tool to release lock cables in the indoor module terminal blocks LEK 1 1...

Page 8: ...on of EMK 300 occurs the first time that flow is measured that is the page for energy measurement in service info is displayed before the flow is metered for the first time Caution Also see the Instal...

Page 9: ...0 EB15 W rmepumpe EB101 Sicherheitsventil Heizungsmedium FL2 Anschluss Heizungsvorlauf XL1 Anschluss Heizungsr cklauf XL2 Anschluss Dockung Eingang Heizungsmedium von der W rmepumpe XL8 Anschluss Dock...

Page 10: ...e Eingangskarte VVM320 1 2 1 Dr cken Sie die Schnappverriegelung hinab 2 Winkel Sie die Abdeckung an und nehmen Sie sie ab Kabelarretierung Verwenden Sie zum L sen bzw Befestigen der Kabel andenAnschl...

Page 11: ...MK 300 erfolgt wenn zum ersten Mal ein Volumenstrom gemessen wird Demnach er scheintdieServiceinfo Seitef rdieW rmemengenmes sung erst wenn der Volumenstrom erstmals gemessen wurde ACHTUNG Siehe auch...

Page 12: ...300 BF1 Indemodul VVM 320 EB15 Varmepumpe EB101 Sikkerhedsventil varmeb rer FL2 Tilslutning varmeb rer frem XL1 Tilslutning varmeb rer retur XL2 Tilslutning sammenkobling ind varmeb rer fra varmepump...

Page 13: ...d ksel indgangskort VVM320 1 2 1 Tryk l sen ned 2 Drej l gen ud og fjern den Kabelb jle Brug egnede v rkt jer til at l sne fastg re kablerne i indend rsmodulets klemmer LEK 1 1 2 2 3 3 1 2 3 3 4 1 2 L...

Page 14: ...ng af EMK 300 Aktivering af EMK 300 sker f rste gang der m les et flow dvs siden for energim ling i serviceinfo vises ikke f r der m les et flow f rste gang HUSK Se ogs installat rh ndbogen for VVM 32...

Page 15: ...K 300 BF1 Sis yksikk VVM 320 EB15 L mp pumppu EB101 Varoventtiili l mmitysj rjestelm FL2 Liit nt l mmitysvesi meno XL1 Liit nt l mmitysvesi paluu XL2 Liit nt l mmitysvesi sis n l mp pumpusta XL8 Liit...

Page 16: ...a alas 2 Kallista luukkua ja ota se pois Kaapelipidike K yt sopivaa ty kalua kaapeleiden irrottamiseen kiin nitt miseen sis yksik n liittimist LEK 1 1 2 2 3 3 1 2 3 3 4 1 2 LEK 1 1 2 2 3 3 1 2 3 3 4 1...

Page 17: ...aktivointi EMK300aktivoidaankunvirtausmitataanensimm isen kerran ts energiamittaussivu huoltotiedoissa ei n y ennen kuin virtaus mitataan ensimm isen kerran MUISTA Katso my s VVM 320 n asentajan k sik...

Page 18: ......

Page 19: ......

Page 20: ...231817 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu...

Reviews: