Electrical connection
NOTE
All electrical connections must be carried out by an
authorised electrician.
Electrical installation and wiring must be carried out
in accordance with the stipulations in force.
ACVM 270 must not be powered when installing EMK
270.
Flow meter
LEK
LEK
Mora kniv
Install the cable for the flow meter and sensors.
Make a cut in the insulation for cable routing.
LEK
LEK
Red
Blue
Blue
Red
Secure the sensors using cable ties.
Heat conducting paste must be used when installing sensors
to obtain the correct temperature measurement.
Reinstall the service cover and clamps. Carry out assembly in reverse
order to removal.
15
EMK 270
GB
Summary of Contents for EMK 270
Page 2: ......
Page 10: ...EMK 270 10 SE...
Page 18: ...EMK 270 18 GB...
Page 26: ...EMK 270 26 DE...
Page 27: ......