32
NIBE BA-SVM 10-200
Connecting BA-SVM 10-200 and AMS 10
Connecting the outdoor temperature sensor
The device connecting cable should be connected to
the power supply terminal block (TB) in AMS 10 and
to the terminal block (X0) in BA-SVM 10-200.
Connect the phase (brown), neutral (blue), communi-
cation (black and grey) and protective (yellow-green)
conductors as shown in the drawing:
CAUTION
The AMS 10 unit must be earthed before connecting
the appliance via the cable. Wiring must be secured so
that the terminal block is not under tension. The end
of the wire should be 8 mm long without insulation
CAUTION
The maximum available heater power in emergency
mode is 3kW.
CAUTION
The temperature on the thermostat must be set ac-
cording to the system requirements. If the tempera-
ture is too high, it can damage the system.
CAUTION
While on emergency mode, it is not possible to heat
hot water.
AMS 10
Min.
5 x 2,5 mm
2
Settings
The electric additional heat has a maximum power of
9 kW (3x400V). The immersion heater power is split
into 3 steps. The possible operational power steps
are: 3, 6 and 9 kW. The maximum power step of the
immersion heater can be set using menu 5.1.12.
Electric additional heat- maximum power
Emergency mode
Emergency mode thermostat
When the controller is set to emergency mode (SF1
is set to ) only the most necessary functions are
activated.
• Hot water is not heated.
• Constant temperature in the supply line, more
information in the section Emergency mode ther-
mostat.
The supply temperature in emergency mode is set
using a thermostat (BT30). It should be set accord-
ing to the demands of the heating/cooling circuits in
operation.
The adjustment range is 6 - 77°C. Please note, how-
ever, that for underfloor heating the setting should be
min. 20°C, max. 35-45°C to maintain comfort in the
room and efficient operation of the system.
5
4
3
2
1
SHK 200S/ SHK 200S-6
BT1
BT1
AA3-X6
The outdoor temperature sensor BT1 (included)
should be connected to the BA-SVM 10-200 unit via
terminal block AA3-X6:1 and AA3-X6:2.
Communication
lines
BA-SVM 10-200
Section 6 |
Electrical connections