16
NIBE BA-SVM 10-200
Docking the indoor unit
Docking the climate system
An external heat source with a maximum power of
15kW, e.g. a gas or oil boiler, can be connected to the
back of the BA-SVM 10-200 unit by removing the plate
blocking access to the connection ports (see drawing
below). Diagram - see p.11.
The BA-SVM 10-200 unit has a condensate hose to drain
the condensation water from the drip tray located under
the hot water tank. The pipe drains all of the condensa-
tion water away from the appliance, minimizing the risk
of damage. This pipe can be extended if needed.
The refrigerant pipes must be installed between the
AMS 10 outdoor unit and the BA-SVM 10-200 indoor unit.
Installation must be carried out in accordance with the
current standards and directives.
Condensate
hose
Supply from
external heat
source
(XL 19)
Return to
external heat
source
(XL 18)
Limitations
• Maximum pipe length on either side, AMS 10-6,
AMS 10-8 and AMS 10-12 (L): 30 m.
• Maximum height difference (H): 7 m.
The pipe connections of the climate system are made
from the top of the appliance.
• All required safety devices and shut-off valves
must be fitted as close to the BA-SVM 10-200
unit as possible.
• Vent valves must be installed where necessary.
• The safety valve with the pressure gauge and
air vent on the central heating circuit, as well as
the safety valve on the hot water system must
be fitted to the appropriate connections XL 11
and XL 3. To prevent air pockets from forming,
the overflow pipe must be inclined in its entire
length from the safety valve and must also be
frost proof.
• When connecting to a system with thermostatic
valves on all radiators/underfloor heating pipes,
to ensure the proper flow and the proper heat-
ing medium volume, install a buffer vessel and
possibly a relief valve. See subsection “Minimum
system flow”.
CAUTION
The term “climate system” which is used in this in-
stallation and user manual signifies heating and cool-
ing operation systems that are supplied with heat or
cold using heating or cooling medium from the BA-
SVM 10-200 unit, for heating or cooling purposes.
Connection of external heat source
Removing condensate
Connecting the refrigerant pipe
(not included)
L
H
L
H
HK 200S
HK 200S
AMS 10
AMS 10
NOTE
It is absolutely necessary for the appropriate safety
valve to be fitted directly on the cold water supply pipe
to the HW tank, to protect the tank against an exces-
sive pressure increase.
NOTE
The outdoor unit, filled with refrigerant at the factory, al-
lows for the use of refrigerant pipes (size L) between the
outdoor unit and the indoor unit measured with a pipe
length of L = 15m. The maximum permissible length of
the refrigerant pipes can be 30m, however this requires
topping up the system with refrigerant.
BA-SVM 10-200
BA-SVM 10-200
Section 4 |
Pipe connections
Summary of Contents for BA-SVM 10-200 Series
Page 2: ......
Page 86: ...86 NIBE BA SVM 10 200 ...
Page 87: ......
Page 88: ...NIBE Group Hannabadsvägen 5 285 32 Markaryd Sweden www nibe eu ...