Pump down
Pump down means retrieving all refrigerant in the
outdoor unit without losing the system's filling. This is
done when the climate unit is to be moved or during
repair of the cooling circuit.
Procedure for "Pump down":
1. Connect a manometer assembly to the low pres-
sure valve, open partially (1/4 turns). Extract air
from the manometer. Then close the high pressure
valve fully.
2. Start the climate unit in cooling mode. When the
pressure that is read out from the manometer has
dropped to a value less than 0.6 bar (absolute
pressure), the low pressure valve must be closed
fully and the climate unit switched off.
1
0,5
0
3. Remove the manometer assembly. The action
"Pump down" is now complete and all refrigerant
has been collected in the outdoor unit.
11
Chapter 5 |
Installation
AG-AA10
Summary of Contents for AG-AA10 Series
Page 1: ...Installer manual AG AA10 30 AG AA10 40 50 AG AA10 Air air heat pump IHB GB 1516 1 331554...
Page 2: ......
Page 21: ......
Page 22: ......
Page 23: ......