Step 10: Cargo Net Assembly
•
Fix the horizontal rope first using the U-nails provided.
•
Now using the rope, knot the vertical rope and secure using the u-nails provided.
•
Ensure that the rope and the knots are pulled as tight as possible, as through time and with
wear the ropes will loosen slightly.
Summary of Contents for Star Pillar
Page 1: ...Star Pillar Climbing Frame Instruction Manual...
Page 2: ...Parts List Item Number Description Image Quantity 1 2 4m post 2 2 1940mm post 4...
Page 4: ...6 Railings 1 7 Set of steps 1 8 32mm decking for rock wall 7...
Page 5: ...9 7ft Slide 1 10 Fireman s Pole 1 11 6x60 screws 4 12 Decking screws Approx 100...
Page 10: ......
Page 13: ......